{"id":11364,"date":"2021-03-02T02:35:18","date_gmt":"2021-03-02T02:35:18","guid":{"rendered":"http:\/\/103.18.247.248\/~sample\/bri_monitor\/?page_id=11364"},"modified":"2021-05-06T07:59:28","modified_gmt":"2021-05-06T07:59:28","slug":"heatmaps","status":"publish","type":"page","link":"http:\/\/103.18.247.248\/~sample\/bri_monitor\/heatmaps\/","title":{"rendered":"Heatmaps"},"content":{"rendered":"<p>[vc_row css=&#8221;.vc_custom_1615520298825{margin-top: 0px !important;}&#8221;][vc_column css=&#8221;.vc_custom_1615520189825{margin-bottom: 30px !important;}&#8221;][vc_custom_heading text=&#8221;<span>BRI<\/span> Regional Transperancy&#8221; font_container=&#8221;tag:h2|font_size:45px|text_align:left|color:%23172f55|line_height:50px&#8221; use_theme_fonts=&#8221;yes&#8221; el_class=&#8221;bri-heading&#8221;][\/vc_column][\/vc_row][vc_row][vc_column][vc_column_text]<\/p>\n<div class=\"transparency-score\">\n<ul>\n<li>Not Transparent<\/li>\n<li><\/li>\n<li>\n<div class=\"score-0\"><\/div>\n<\/li>\n<li>\n<div class=\"score-1\"><\/div>\n<\/li>\n<li>\n<div class=\"score-2\"><\/div>\n<\/li>\n<li>\n<div class=\"score-3\"><\/div>\n<\/li>\n<li>\n<div class=\"score-4\"><\/div>\n<\/li>\n<li>\n<div class=\"score-5\"><\/div>\n<\/li>\n<li>\n<div class=\"score-6\"><\/div>\n<\/li>\n<li>Transparent<\/li>\n<\/ul>\n<\/div>\n<div class=\"table-responsive\">\n<table class=\"table bri-heatmaps\">\n<thead>\n<tr>\n<th rowspan=\"2\">Case Study (Country)<\/th>\n<th colspan=\"2\">Malaysia<\/th>\n<th>Cambodia<\/th>\n<th>Myanmar<\/th>\n<th colspan=\"3\">Philippines<\/th>\n<th>Papua New Guinea<\/th>\n<\/tr>\n<tr>\n<th><a title=\"\" href=\"http:\/\/103.18.247.248\/~sample\/bri_monitor\/case-study\/east-coast-railway-link-ecrl\/\" data-toggle=\"tooltip\" data-placement=\"top\" data-original-title=\"East Coast Railway Link (ECRL)\">ECRL<\/a><\/th>\n<th><a title=\"\" href=\"http:\/\/103.18.247.248\/~sample\/bri_monitor\/case-study\/gemas-johor-bahru-electrified-double-track-project\/\" data-toggle=\"tooltip\" data-placement=\"top\" data-original-title=\"Gemas-Johor Bahru Electrified Double Track Project\">G-JB<\/a><\/th>\n<th><a title=\"\" href=\"http:\/\/103.18.247.248\/~sample\/bri_monitor\/case-study\/the-tatay-river-hydropower-dam\/\" data-toggle=\"tooltip\" data-placement=\"top\" data-original-title=\"The Tatay River Hydropower Dam\">TRHD<\/a><\/th>\n<th><a title=\"\" href=\"http:\/\/103.18.247.248\/~sample\/bri_monitor\/case-study\/letpadaung-copper-mine-project\/\" data-toggle=\"tooltip\" data-placement=\"top\" data-original-title=\"Letpadaung Copper Mine Project\">LCMP<\/a><\/th>\n<th><a title=\"\" href=\"http:\/\/103.18.247.248\/~sample\/bri_monitor\/case-study\/the-new-centennial-water-source-kaliwa-dam-project-ncws-kdp\/\" data-toggle=\"tooltip\" data-placement=\"top\" data-original-title=\"The New Centennial Water Source-Kaliwa Dam Project (NCWS-KDP)\">NCWS<\/a><\/th>\n<th><a title=\"\" href=\"http:\/\/103.18.247.248\/~sample\/bri_monitor\/case-study\/chico-river-pump-irrigation-project-crpip\/\" data-toggle=\"tooltip\" data-placement=\"top\" data-original-title=\"Chico River Pump Irrigation Project (CRPIP)\">CRPIP<\/a><\/th>\n<th><a title=\"\" href=\"http:\/\/103.18.247.248\/~sample\/bri_monitor\/case-study\/dito-telecommunity-dito\/\" data-toggle=\"tooltip\" data-placement=\"top\" data-original-title=\"DITO Telecommunity (DITO)\">DITO<\/a><\/th>\n<th><a title=\"\" href=\"http:\/\/103.18.247.248\/~sample\/bri_monitor\/case-study\/kumul-submarine-cable-network-project-kscnp\/\" data-toggle=\"tooltip\" data-placement=\"top\" data-original-title=\"Kumul Submarine Cable Network Project (KSCNP)\">KSCNP<\/a><\/th>\n<\/tr>\n<\/thead>\n<tbody>\n<tr>\n<td><span data-toggle=\"tooltip\" data-placement=\"bottom\" data-original-title=\"Name of the sponsoring Government department\">Project Owner<\/span><\/td>\n<td class=\"td-score-5\"><a href=\"http:\/\/103.18.247.248\/~sample\/bri_monitor\/case-study\/east-coast-railway-link-ecrl\/\" data-toggle=\"tooltip\" data-html=\"true\" data-placement=\"top\" data-original-title=\"[ECRL]&lt;br&gt;&lt;br&gt;Malaysia Rail Link Sdn Bhd\">OOOOOO<\/a><\/td>\n<td class=\"td-score-4\"><a href=\"http:\/\/103.18.247.248\/~sample\/bri_monitor\/case-study\/gemas-johor-bahru-electrified-double-track-project\/\" data-toggle=\"tooltip\" data-html=\"true\" data-placement=\"top\" data-original-title=\"[G-JB]&lt;br&gt;&lt;br&gt;Malaysian Ministry of Transport\">OOOOOO<\/a><\/td>\n<td class=\"td-score-2\"><a href=\"http:\/\/103.18.247.248\/~sample\/bri_monitor\/case-study\/the-tatay-river-hydropower-dam\/\" data-toggle=\"tooltip\" data-html=\"true\" data-placement=\"top\" data-original-title=\"[TRHD]&lt;br&gt;&lt;br&gt;Cambodian Stung Tatay Hydropower Company Ltd.\">OOOOOO<\/a><\/td>\n<td class=\"td-score-2\"><a href=\"http:\/\/103.18.247.248\/~sample\/bri_monitor\/case-study\/letpadaung-copper-mine-project\/\" data-toggle=\"tooltip\" data-html=\"true\" data-placement=\"top\" data-original-title=\"[LCMP]&lt;br&gt;&lt;br&gt;No. 1, Mining Enterprise, Ministry of Natural Resources and Environmental Conservation\">OOOOOO<\/a><\/td>\n<td class=\"td-score-4\"><a href=\"http:\/\/103.18.247.248\/~sample\/bri_monitor\/case-study\/the-new-centennial-water-source-kaliwa-dam-project-ncws-kdp\/\" data-toggle=\"tooltip\" data-html=\"true\" data-placement=\"top\" data-original-title=\"[NCWS]&lt;br&gt;&lt;br&gt;Metropolitan Waterworks and Sewerage System (MWSS)\">OOOOOO<\/a><\/td>\n<td class=\"td-score-4\"><a href=\"http:\/\/103.18.247.248\/~sample\/bri_monitor\/case-study\/chico-river-pump-irrigation-project-crpip\/\" data-toggle=\"tooltip\" data-html=\"true\" data-placement=\"top\" data-original-title=\"[CRPIP]&lt;br&gt;&lt;br&gt;National Irrigation Administration (NIA)\">OOOOOO<\/a><\/td>\n<td><\/td>\n<td class=\"td-score-5\"><a href=\"http:\/\/103.18.247.248\/~sample\/bri_monitor\/case-study\/kumul-submarine-cable-network-project-kscnp\/\" data-toggle=\"tooltip\" data-html=\"true\" data-placement=\"top\" data-original-title=\"[KSCNP]&lt;br&gt;&lt;br&gt;PNG DataCO Ltd\">OOOOOO<\/a><\/td>\n<\/tr>\n<tr>\n<td><span data-toggle=\"tooltip\" data-placement=\"top\" data-original-title=\"Develop a list of sectors relevant to country e.g. housing, transport, energy, water etc.\">Sector, Subsector<\/span><\/td>\n<td class=\"td-score-4\"><a href=\"http:\/\/103.18.247.248\/~sample\/bri_monitor\/case-study\/east-coast-railway-link-ecrl\/\" data-toggle=\"tooltip\" data-html=\"true\" data-placement=\"top\" data-original-title=\"[ECRL]&lt;br&gt;&lt;br&gt;Transport; High Speed Railways\">OOOOOO<\/a><\/td>\n<td class=\"td-score-4\"><a href=\"http:\/\/103.18.247.248\/~sample\/bri_monitor\/case-study\/gemas-johor-bahru-electrified-double-track-project\/\" data-toggle=\"tooltip\" data-html=\"true\" data-placement=\"top\" data-original-title=\"[G-JB]&lt;br&gt;&lt;br&gt;Transport; Railway\">OOOOOO<\/a><\/td>\n<td class=\"td-score-2\"><a href=\"http:\/\/103.18.247.248\/~sample\/bri_monitor\/case-study\/the-tatay-river-hydropower-dam\/\" data-toggle=\"tooltip\" data-html=\"true\" data-placement=\"top\" data-original-title=\"[TRHD]&lt;br&gt;&lt;br&gt;Energy, Water resources\">OOOOOO<\/a><\/td>\n<td class=\"td-score-4\"><a href=\"http:\/\/103.18.247.248\/~sample\/bri_monitor\/case-study\/letpadaung-copper-mine-project\/\" data-toggle=\"tooltip\" data-html=\"true\" data-placement=\"top\" data-original-title=\"[LCMP]&lt;br&gt;&lt;br&gt;Extractive Industry: Copper Mine\">OOOOOO<\/a><\/td>\n<td class=\"td-score-4\"><a href=\"http:\/\/103.18.247.248\/~sample\/bri_monitor\/case-study\/the-new-centennial-water-source-kaliwa-dam-project-ncws-kdp\/\" data-toggle=\"tooltip\" data-html=\"true\" data-placement=\"top\" data-original-title=\"[NCWS]&lt;br&gt;&lt;br&gt;Water Resources\">OOOOOO<\/a><\/td>\n<td class=\"td-score-4\"><a href=\"http:\/\/103.18.247.248\/~sample\/bri_monitor\/case-study\/chico-river-pump-irrigation-project-crpip\/\" data-toggle=\"tooltip\" data-html=\"true\" data-placement=\"top\" data-original-title=\"[CRPIP]&lt;br&gt;&lt;br&gt;Water Resources\">OOOOOO<\/a><\/td>\n<td><\/td>\n<td class=\"td-score-5\"><a href=\"http:\/\/103.18.247.248\/~sample\/bri_monitor\/case-study\/kumul-submarine-cable-network-project-kscnp\/\" data-toggle=\"tooltip\" data-html=\"true\" data-placement=\"top\" data-original-title=\"[KSCNP]&lt;br&gt;&lt;br&gt;Telecommunications, State owned Enterprise sector.\">OOOOOO<\/a><\/td>\n<\/tr>\n<tr>\n<td><span data-toggle=\"tooltip\" data-placement=\"top\" data-original-title=\"Specify the project name\">Project Name<\/span><\/td>\n<td class=\"td-score-5\"><a href=\"http:\/\/103.18.247.248\/~sample\/bri_monitor\/case-study\/east-coast-railway-link-ecrl\/\" data-toggle=\"tooltip\" data-html=\"true\" data-placement=\"top\" data-original-title=\"[ECRL]&lt;br&gt;&lt;br&gt;East Cost Rail Link (ECRL)\">OOOOOO<\/a><\/td>\n<td class=\"td-score-5\"><a href=\"http:\/\/103.18.247.248\/~sample\/bri_monitor\/case-study\/gemas-johor-bahru-electrified-double-track-project\/\" data-toggle=\"tooltip\" data-html=\"true\" data-placement=\"top\" data-original-title=\"[G-JB]&lt;br&gt;&lt;br&gt;Electrified Double Track Gemas-Johor Bahru Rail Project; Projek Landasan Berkembar Elektrik Gemas-Johor Bahru\">OOOOOO<\/a><\/td>\n<td class=\"td-score-2\"><a href=\"http:\/\/103.18.247.248\/~sample\/bri_monitor\/case-study\/the-tatay-river-hydropower-dam\/\" data-toggle=\"tooltip\" data-html=\"true\" data-placement=\"top\" data-original-title=\"[TRHD]&lt;br&gt;&lt;br&gt;Stung Tatay Hydropower Plant\">OOOOOO<\/a><\/td>\n<td class=\"td-score-2\"><a href=\"http:\/\/103.18.247.248\/~sample\/bri_monitor\/case-study\/letpadaung-copper-mine-project\/\" data-toggle=\"tooltip\" data-html=\"true\" data-placement=\"top\" data-original-title=\"[LCMP]&lt;br&gt;&lt;br&gt;Letpadaung Copper Mine Project\">OOOOOO<\/a><\/td>\n<td class=\"td-score-4\"><a href=\"http:\/\/103.18.247.248\/~sample\/bri_monitor\/case-study\/the-new-centennial-water-source-kaliwa-dam-project-ncws-kdp\/\" data-toggle=\"tooltip\" data-html=\"true\" data-placement=\"top\" data-original-title=\"[NCWS]&lt;br&gt;&lt;br&gt;New Centennial Water Source-Kaliwa Dam Project (NCWS-KDP)\">OOOOOO<\/a><\/td>\n<td class=\"td-score-4\"><a href=\"http:\/\/103.18.247.248\/~sample\/bri_monitor\/case-study\/chico-river-pump-irrigation-project-crpip\/\" data-toggle=\"tooltip\" data-html=\"true\" data-placement=\"top\" data-original-title=\"[CRPIP]&lt;br&gt;&lt;br&gt;Chico River Pump Irrigation Project (CRPIP)\">OOOOOO<\/a><\/td>\n<td><\/td>\n<td class=\"td-score-5\"><a href=\"http:\/\/103.18.247.248\/~sample\/bri_monitor\/case-study\/kumul-submarine-cable-network-project-kscnp\/\" data-toggle=\"tooltip\" data-html=\"true\" data-placement=\"top\" data-original-title=\"[KSCNP]&lt;br&gt;&lt;br&gt;Kumul Submarine Cable Network\">OOOOOO<\/a><\/td>\n<\/tr>\n<tr>\n<td><span data-toggle=\"tooltip\" data-placement=\"top\" data-original-title=\"Briefly specify location of the project\">Project Location<\/span><\/td>\n<td class=\"td-score-4\"><a href=\"http:\/\/103.18.247.248\/~sample\/bri_monitor\/case-study\/east-coast-railway-link-ecrl\/\" data-toggle=\"tooltip\" data-html=\"true\" data-placement=\"top\" data-original-title=\"[ECRL]&lt;br&gt;&lt;br&gt;640km; running through 20 stations from the east cost Kota Bahru to Port Klang in Selangor, passing through Kelantan, Terengganu, Pahang, Negeri Sembilan, Selangor, Federal Territory of Putrajaya\">OOOOOO<\/a><\/td>\n<td class=\"td-score-4\"><a href=\"http:\/\/103.18.247.248\/~sample\/bri_monitor\/case-study\/gemas-johor-bahru-electrified-double-track-project\/\" data-toggle=\"tooltip\" data-html=\"true\" data-placement=\"top\" data-original-title=\"[G-JB]&lt;br&gt;&lt;br&gt;begin in Gemas and will cover 4 main districts in Johor which are Segamat, Kluang, Kulai and Johor Bahru, ending at JB Sentral.\">OOOOOO<\/a><\/td>\n<td class=\"td-score-2\"><a href=\"http:\/\/103.18.247.248\/~sample\/bri_monitor\/case-study\/the-tatay-river-hydropower-dam\/\" data-toggle=\"tooltip\" data-html=\"true\" data-placement=\"top\" data-original-title=\"[TRHD]&lt;br&gt;&lt;br&gt;Thma Bang District (Although mistranslated to MaBang district in the press release)\">OOOOOO<\/a><\/td>\n<td class=\"td-score-2\"><a href=\"http:\/\/103.18.247.248\/~sample\/bri_monitor\/case-study\/letpadaung-copper-mine-project\/\" data-toggle=\"tooltip\" data-html=\"true\" data-placement=\"top\" data-original-title=\"[LCMP]&lt;br&gt;&lt;br&gt;28.1725 Sq Km wide Letpadaung Copper Mine, Salingyi Township of Sagaing Region\">OOOOOO<\/a><\/td>\n<td class=\"td-score-4\"><a href=\"http:\/\/103.18.247.248\/~sample\/bri_monitor\/case-study\/the-new-centennial-water-source-kaliwa-dam-project-ncws-kdp\/\" data-toggle=\"tooltip\" data-html=\"true\" data-placement=\"top\" data-original-title=\"[NCWS]&lt;br&gt;&lt;br&gt;Sitio Cablao, Brgy. Pagsangahan, General Nakar, Quezon \/ Sitio Queborosa, Brgy. Magsaysay, Infanta, Quezon\">OOOOOO<\/a><\/td>\n<td class=\"td-score-4\"><a href=\"http:\/\/103.18.247.248\/~sample\/bri_monitor\/case-study\/chico-river-pump-irrigation-project-crpip\/\" data-toggle=\"tooltip\" data-html=\"true\" data-placement=\"top\" data-original-title=\"[CRPIP]&lt;br&gt;&lt;br&gt;\u00b7 Municipality of Pinukpuk, Kalinga&lt;br&gt; \u00b7 Municipality of Tuao and Piat, Cagayan\">OOOOOO<\/a><\/td>\n<td><\/td>\n<td class=\"td-score-5\"><a href=\"http:\/\/103.18.247.248\/~sample\/bri_monitor\/case-study\/kumul-submarine-cable-network-project-kscnp\/\" data-toggle=\"tooltip\" data-html=\"true\" data-placement=\"top\" data-original-title=\"[KSCNP]&lt;br&gt;&lt;br&gt;Kumul Submarine Cable network is a 5,457 kilometre domestic internet platform to link capitals of fourteen (14) coastal provinces. System 1 (Jayapura, Vanimo, Wewak, Madang, Manus, Kavieng, Kimbe and Kieta); System 2 (Madang, Lae, Popodetta, Alotau, Port Moresby); and System 3 (Port Moresby, Kerema and Daru).\">OOOOOO<\/a><\/td>\n<\/tr>\n<tr>\n<td><span data-toggle=\"tooltip\" data-placement=\"top\" data-original-title=\"Specify the socio economic purpose of the project\">Purpose<\/span><\/td>\n<td class=\"td-score-5\"><a href=\"http:\/\/103.18.247.248\/~sample\/bri_monitor\/case-study\/east-coast-railway-link-ecrl\/\" data-toggle=\"tooltip\" data-html=\"true\" data-placement=\"top\" data-original-title=\"[ECRL]&lt;br&gt;&lt;br&gt;To provide a much-improved connectivity throughout the East Coast region, as well as connecting it to the West Coast, while at the same time, taking into consideration the potential growth for the industrial, commercial and tourism sectors along the ECRL corridor.\">OOOOOO<\/a><\/td>\n<td class=\"td-score-4\"><a href=\"http:\/\/103.18.247.248\/~sample\/bri_monitor\/case-study\/gemas-johor-bahru-electrified-double-track-project\/\" data-toggle=\"tooltip\" data-html=\"true\" data-placement=\"top\" data-original-title=\"[G-JB]&lt;br&gt;&lt;br&gt;To improve the quality of rail infrastructure, provide a better quality, conducive, safe and passenger-friendly train service, and improve rail safety for operations.\">OOOOOO<\/a><\/td>\n<td class=\"td-score-2\"><a href=\"http:\/\/103.18.247.248\/~sample\/bri_monitor\/case-study\/the-tatay-river-hydropower-dam\/\" data-toggle=\"tooltip\" data-html=\"true\" data-placement=\"top\" data-original-title=\"[TRHD]&lt;br&gt;&lt;br&gt;Produce electricity, help meet the demand gap in Cambodia, contribute to economic growth\">OOOOOO<\/a><\/td>\n<td class=\"td-score-4\"><a href=\"http:\/\/103.18.247.248\/~sample\/bri_monitor\/case-study\/letpadaung-copper-mine-project\/\" data-toggle=\"tooltip\" data-html=\"true\" data-placement=\"top\" data-original-title=\"[LCMP]&lt;br&gt;&lt;br&gt;1) To fulfill domestic raw material for mineral resources and promote export of same.&lt;br&gt; (2) To promote production of mineral raw materials which would initiate development of heavy industries leading to long term national development.&lt;br&gt; (3) To emphasize exploration and production of important mineral resources. \">OOOOOO<\/a><\/td>\n<td class=\"td-score-5\"><a href=\"http:\/\/103.18.247.248\/~sample\/bri_monitor\/case-study\/the-new-centennial-water-source-kaliwa-dam-project-ncws-kdp\/\" data-toggle=\"tooltip\" data-html=\"true\" data-placement=\"top\" data-original-title=\"[NCWS]&lt;br&gt;&lt;br&gt;The NCWS-KDP was born out of the necessity to ensure an uninterrupted water supply in Metro Manila. It was conceptualized to address the concern of possible water supply deficit in Metro Manila. Currently, MWSS is relying on the supply form Angat Dam which supplies 95% of its service areas. The Project is one of the flagship initiatives of the Government under the \u201cBuild, Build, Build\u201d Program.\">OOOOOO<\/a><\/td>\n<td class=\"td-score-4\"><a href=\"http:\/\/103.18.247.248\/~sample\/bri_monitor\/case-study\/chico-river-pump-irrigation-project-crpip\/\" data-toggle=\"tooltip\" data-html=\"true\" data-placement=\"top\" data-original-title=\"[CRPIP]&lt;br&gt;&lt;br&gt;Funded by a soft loan from the China Exim Bank and to be implemented by the China CAMC Engineering Company, Ltd., the Chico River PIP aims to irrigate 7,530 hectares in Tuao and Piat, Cagayan and 1,170 ha in Pinukpuk, Kalinga benefitting 4,350 families.\">OOOOOO<\/a><\/td>\n<td><\/td>\n<td class=\"td-score-5\"><a href=\"http:\/\/103.18.247.248\/~sample\/bri_monitor\/case-study\/kumul-submarine-cable-network-project-kscnp\/\" data-toggle=\"tooltip\" data-html=\"true\" data-placement=\"top\" data-original-title=\"[KSCNP]&lt;br&gt;&lt;br&gt;The project is in line with the country\u2019s strategic development plan towards improving telecommunication services in PNG where it is operating from a poor infrastructure provided by a combination of fixed lines, mobile wireless, satellite visat systems and microwave band services. As such, this project is vital towards improving existing facilities and reduce high cost of internet locally through use of latest technology fibre optic to transmit data domestically and internationally. With improved performance and reduced costs of communication services facilitating broad economic growth nationally.\">OOOOOO<\/a><\/td>\n<\/tr>\n<tr>\n<td><span data-toggle=\"tooltip\" data-placement=\"top\" data-original-title=\"Concise description and details of the project\">Project Description<\/span><\/td>\n<td class=\"td-score-5\"><a href=\"http:\/\/103.18.247.248\/~sample\/bri_monitor\/case-study\/east-coast-railway-link-ecrl\/\" data-toggle=\"tooltip\" data-html=\"true\" data-placement=\"top\" data-original-title=\"[ECRL]&lt;br&gt;&lt;br&gt;After Supplementary Agreement dated 12\/4\/2019: The ECRL will comprise of 20 stations, including 14 passenger stations, five combined passenger and freight stations, and one freight station. The route will have approximately 40 tunnels from Kota Bharu to Port Klang. The line will also feature multiple viaducts of approximately 100km in length.\">OOOOOO<\/a><\/td>\n<td class=\"td-score-4\"><\/td>\n<td class=\"td-score-2\"><a href=\"http:\/\/103.18.247.248\/~sample\/bri_monitor\/case-study\/the-tatay-river-hydropower-dam\/\" data-toggle=\"tooltip\" data-html=\"true\" data-placement=\"top\" data-original-title=\"[TRHD]&lt;br&gt;&lt;br&gt;A 246MW hydropower dam constructed on the Tatay River in Cambodia\u2019s Koh Kong province. Funded by a $540 million loan from China\u2019s Exim Bank under a 42-year Build-Operate-Transfer contract. Construction began in 2010 and finished in 2015. Electricity from the dam is sold to Cambodian state-owned Electricit\u00e9 du Cambodge at 7.45 cents per kWh.\">OOOOOO<\/a><\/td>\n<td class=\"td-score-4\"><a href=\"http:\/\/103.18.247.248\/~sample\/bri_monitor\/case-study\/letpadaung-copper-mine-project\/\" data-toggle=\"tooltip\" data-html=\"true\" data-placement=\"top\" data-original-title=\"[LCMP]&lt;br&gt;&lt;br&gt;In cooperation with the Union of Myanmar Economic Holdings Ltd (UMEHL), Wanbao Mining Copper Company Ltd., a subsidiary of China North Industries Group Corp. or Norinco, a large arms manufacturer, bought the project from Ivanhoe, a Canadian mining company in 2011. The final agreement with Wanbao, reached the Product Sharing Contract in 2012. Original Product Sharing Contract signed in July 2013 was amended by Mining Enterprise No. 1 under Ministry of Mines. Under new terms, the Government of Myanmar enjoys 51% of the benefit and Myanmar Wanbao Mining Copper Limited (MWMCL) and MEHL will retain 49%.\">OOOOOO<\/a><\/td>\n<td class=\"td-score-5\"><a href=\"http:\/\/103.18.247.248\/~sample\/bri_monitor\/case-study\/the-new-centennial-water-source-kaliwa-dam-project-ncws-kdp\/\" data-toggle=\"tooltip\" data-html=\"true\" data-placement=\"top\" data-original-title=\"[NCWS]&lt;br&gt;&lt;br&gt;Kaliwa Dam Project or the New Centennial Water Supply Project is a new water source to be constructed to meet the increasing demand of the people of Metro Manila, Rizal and Quezon (17.46M people o 3.49M household) by constructing another dam and to reduce total dependence on the Angat Dam.&lt;br&gt;&lt;br&gt; This \u201cclimate resilient\u201d project is envisioned to help Angat Dam, based on the comprehensive studies conducted by Word Bank and JICA. This is also aligned with the Sustainable Development Goals (SDG) that is to have access to clean water supply. While it is true there are other sources of water, the cost of treatment is so high. This is already published in books \u2013 Kaliwa, Kanan and Agos rivers can help us achieve water security.\">OOOOOO<\/a><\/td>\n<td class=\"td-score-4\"><a href=\"http:\/\/103.18.247.248\/~sample\/bri_monitor\/case-study\/chico-river-pump-irrigation-project-crpip\/\" data-toggle=\"tooltip\" data-html=\"true\" data-placement=\"top\" data-original-title=\"[CRPIP]&lt;br&gt;&lt;br&gt;CRPIP, one of the flagship projects of the Duterte Administration under the Build, Build, Build Program, has a total budget of Php 4.37 billion.&lt;br&gt;&lt;br&gt; It is expected to provide efficient and reliable irrigation service to 8,700 hectares of riceland; 7,530 hectares of which are located in Cagayan and the remaining 1,170 hectares are in Kalinga. 4,350 farmers from 22 barangays will benefit once the project is completed.\">OOOOOO<\/a><\/td>\n<td><\/td>\n<td class=\"td-score-5\"><a href=\"http:\/\/103.18.247.248\/~sample\/bri_monitor\/case-study\/kumul-submarine-cable-network-project-kscnp\/\" data-toggle=\"tooltip\" data-html=\"true\" data-placement=\"top\" data-original-title=\"[KSCNP]&lt;br&gt;&lt;br&gt;Scope of work include; construction of fibre optic cables linking 14 provincial capitals covering 5,457 kilometres, construction of respective cable landing centres, installation of electronic transmitting systems, instillation of electricity power back up systems to energize the cable network system, procurement of equipment, materials and supplies, feasibility studies, administration, supervision and coordination of the project. \">OOOOOO<\/a><\/td>\n<\/tr>\n<tr>\n<td><span data-toggle=\"tooltip\" data-placement=\"top\" data-original-title=\"Main outputs from the project that are being taken forward into construction (type, quantity, unit)\">Project Scope<\/span><\/td>\n<td class=\"td-score-5\"><a href=\"http:\/\/103.18.247.248\/~sample\/bri_monitor\/case-study\/east-coast-railway-link-ecrl\/\" data-toggle=\"tooltip\" data-html=\"true\" data-placement=\"top\" data-original-title=\"[ECRL]&lt;br&gt;&lt;br&gt;Key outputs have been disclosed, but full details (type, quantity, unit) unreleased&lt;br&gt;- 20 stations&lt;br&gt;- Standard gauge, double-tracking&lt;br&gt;- 30-40 tunnels&lt;br&gt;- 6-car train set for the EMUs, no specified number of EMUs&lt;br&gt;- Viaducts in Terengganu\">OOOOOO<\/a><\/td>\n<td class=\"td-score-4\"><a href=\"http:\/\/103.18.247.248\/~sample\/bri_monitor\/case-study\/gemas-johor-bahru-electrified-double-track-project\/\" data-toggle=\"tooltip\" data-html=\"true\" data-placement=\"top\" data-original-title=\"[G-JB]&lt;br&gt;&lt;br&gt;The project scope includes 197km of electrified double track, stations, electric trains depots, Land Viaduct, bridges, electrification and signaling systems.\">OOOOOO<\/a><\/td>\n<td class=\"td-score-2\"><a href=\"http:\/\/103.18.247.248\/~sample\/bri_monitor\/case-study\/the-tatay-river-hydropower-dam\/\" data-toggle=\"tooltip\" data-html=\"true\" data-placement=\"top\" data-original-title=\"[TRHD]&lt;br&gt;&lt;br&gt;-1 170m dam wall&lt;br&gt; -3 82 MW Francis Turbine Generators&lt;br&gt; -Annual generating capacity of 849 kWh&lt;br&gt; -Three whole spillways on left bank&lt;br&gt; -Power plant on left bank\">OOOOOO<\/a><\/td>\n<td class=\"td-score-4\"><a href=\"http:\/\/103.18.247.248\/~sample\/bri_monitor\/case-study\/letpadaung-copper-mine-project\/\" data-toggle=\"tooltip\" data-html=\"true\" data-placement=\"top\" data-original-title=\"[LCMP]&lt;br&gt;&lt;br&gt;Expected 100,000 tons of Copper per annum\">OOOOOO<\/a><\/td>\n<td class=\"td-score-5\"><a href=\"http:\/\/103.18.247.248\/~sample\/bri_monitor\/case-study\/the-new-centennial-water-source-kaliwa-dam-project-ncws-kdp\/\" data-toggle=\"tooltip\" data-html=\"true\" data-placement=\"top\" data-original-title=\"[NCWS]&lt;br&gt;&lt;br&gt; 1. Dam structure: Barangay Pagsangahan, General Nakar, Quezon, and Barangay Magsaysay, Infanta, Quezon (60-meter high with an initial supply of 600 million liters per day);&lt;br&gt;&lt;br&gt; Dam Capacity: 57 cubic meters; With spillway, diversion tunnels, low level outlet and reservoir.&lt;br&gt;&lt;br&gt; 2. Tunnel: 4m diameter x 27.70 km; depth from lowest peak (70m); depth from highest peak (500m)&lt;br&gt;&lt;br&gt; 3. Water Treatment Plants\">OOOOOO<\/a><\/td>\n<td class=\"td-score-3\"><a href=\"http:\/\/103.18.247.248\/~sample\/bri_monitor\/case-study\/chico-river-pump-irrigation-project-crpip\/\" data-toggle=\"tooltip\" data-html=\"true\" data-placement=\"top\" data-original-title=\"[CRPIP]&lt;br&gt;&lt;br&gt;The project includes the construction of Pump House, Sub-Station, Transmission Line, Diversion Main Canal, Lateral Canals, Appurtenant Structures, Service\/Access Road, and Terminal Facilities for CRPIP.\">OOOOOO<\/a><\/td>\n<td><\/td>\n<td class=\"td-score-4\"><a href=\"http:\/\/103.18.247.248\/~sample\/bri_monitor\/case-study\/kumul-submarine-cable-network-project-kscnp\/\" data-toggle=\"tooltip\" data-html=\"true\" data-placement=\"top\" data-original-title=\"[KSCNP]&lt;br&gt;&lt;br&gt;- Constructing 5,457 kilometres of sea cable to connect 15 provincial sites&lt;br&gt; - Procure of equipment, materials and construction&lt;br&gt; - Feasibility study, survey and technical design&lt;br&gt; - Project advisory, supervision and management\">OOOOOO<\/a><\/td>\n<\/tr>\n<tr>\n<td><span data-toggle=\"tooltip\" data-placement=\"top\" data-original-title=\"Briefly describe the environmental impacts and mitigation measures for this project e.g. impacts on flora, fauna &amp; woodlands, areas of natural beauty, carbon emissions etc. and mitigation measures e.g. pollution control, low carbon solutions, sustainable timber etc.\">Environment Impact<\/span><\/td>\n<td class=\"td-score-2\"><\/td>\n<td class=\"td-score-0\"><a href=\"http:\/\/103.18.247.248\/~sample\/bri_monitor\/case-study\/gemas-johor-bahru-electrified-double-track-project\/\" data-toggle=\"tooltip\" data-html=\"true\" data-placement=\"top\" data-original-title=\"[G-JB]&lt;br&gt;&lt;br&gt;Not available\">OOOOOO<\/a><\/td>\n<td class=\"td-score-2\"><a href=\"http:\/\/103.18.247.248\/~sample\/bri_monitor\/case-study\/the-tatay-river-hydropower-dam\/\" data-toggle=\"tooltip\" data-html=\"true\" data-placement=\"top\" data-original-title=\"[TRHD]&lt;br&gt;&lt;br&gt;This project results in the loss of 2949 hectares permanently and 182 hectares temporarily. It can cause flooding of nearly 3000ha forest which is the home of many wildlife and fish species including elephant, Sun bear, wild boar, Siamese crocodile, dragonfish, etc. Also, the project will affect communities\u2019 livelihoods in that the local populace relies on that forest for living. Besides, this construction also causes problems in air and water quality both during construction and some years after the project finished. Since this project area was the last refuge of Khmer Rouge, the large number of land mines were recognized as having potential to cause injury or death to construction workers.&lt;br&gt; Responding to these issues, the project owner will cooperate with forestry administration and relevant ministries to establish a forest committee. This committee has a role to manage the forest clearance and detect any illegal activities in and around the project side. During the construction, the company will reduce the air pollution and noise effect by using high-quality machines and following the standard of ministry of Environment. The company will also establish a foundation to support any forest conservation program. Moreover, They will provide a budget for supporting agriculture programs (animal feeding, farming, .i.e.) and loans for vulnerable local people to run small businesses as well. In addition, the company will tackle waste management, trees planting, and healthcare services. On the other hand, they also work with CMAC to clear mines around that area to provide safety to the construction worker.\">OOOOOO<\/a><\/td>\n<td class=\"td-score-4\"><a href=\"http:\/\/103.18.247.248\/~sample\/bri_monitor\/case-study\/letpadaung-copper-mine-project\/\" data-toggle=\"tooltip\" data-html=\"true\" data-placement=\"top\" data-original-title=\"[LCMP]&lt;br&gt;&lt;br&gt;Environmental impacts: Groundwater supply &amp; contamination, Change in land form and landscape character, soil contamination, lowering of ground water level, contamination of ground water resources, contamination of rivers and watercourses, exceedence of health screening guidelines from ground level concentration of dust, Social impacts: resettlement, loss of catchment yield, loss of traditional livelihood, social problems, impacts on living standards, cultural heritage, Mitigation measures - zero-discharge site, a series of monitoring stations around the site, 2% community development, public consultation, health monitoring,\">OOOOOO<\/a><\/td>\n<td class=\"td-score-5\"><a href=\"http:\/\/103.18.247.248\/~sample\/bri_monitor\/case-study\/the-new-centennial-water-source-kaliwa-dam-project-ncws-kdp\/\" data-toggle=\"tooltip\" data-html=\"true\" data-placement=\"top\" data-original-title=\"[NCWS]&lt;br&gt;&lt;br&gt; \u00b7 The Land\/Water Terrain-modification, soil displacement, and erosion&lt;br&gt; \u00b7 Deterioration of river water quality&lt;br&gt; \u00b7 Death, disturbance and displacement of wildlife species; destruction or damage to habitat&lt;br&gt; \u00b7 Disturbance of aquatic habitat death or temporary displacement of species (MS)&lt;br&gt; \u00b7 Increase in solid waste generation &lt;br&gt; \u00b7 Permanent loss, disturbance to existing vegetation\">OOOOOO<\/a><\/td>\n<td class=\"td-score-2\"><a href=\"http:\/\/103.18.247.248\/~sample\/bri_monitor\/case-study\/chico-river-pump-irrigation-project-crpip\/\" data-toggle=\"tooltip\" data-html=\"true\" data-placement=\"top\" data-original-title=\"[CRPIP]&lt;br&gt;&lt;br&gt;There is a threat that the project will lead to environmental degradation, including widespread flooding, and consequently contribute to disturbing the rich biodiversity in the area.&lt;br&gt;&lt;br&gt; There is concern that the CRPIP will deprive some of the downstream communities of water supply and further aggravate the scarcity of water in the Chico River during summer\">OOOOOO<\/a><\/td>\n<td><\/td>\n<td class=\"td-score-0\"><a href=\"http:\/\/103.18.247.248\/~sample\/bri_monitor\/case-study\/kumul-submarine-cable-network-project-kscnp\/\" data-toggle=\"tooltip\" data-html=\"true\" data-placement=\"top\" data-original-title=\"[KSCNP]&lt;br&gt;&lt;br&gt;Not available&lt;br&gt; Only assurances given by PNG DataCo Ltd that there is no environmental effect from the Kumul Submarine Cable Network that has been laid in the provinces including emissions of electromagnetic radiation and has not real, if not, negligible health or environmental hazards or risks.\">OOOOOO<\/a><\/td>\n<\/tr>\n<tr>\n<td><span data-toggle=\"tooltip\" data-placement=\"top\" data-original-title=\"State the amount of land and property that was acquired for the project e.g. 25km2 land, and related impacts e.g. archaeological issues (moved saxon burial site), local\/indigenous settlements (relocated 5 indigenous villages of 500 villagers each), impacts on local businesses e.g. (30 business properties purchased).\">Land &amp; Settlement Impact<\/span><\/td>\n<td class=\"td-score-2\"><\/td>\n<td class=\"td-score-2\"><a href=\"http:\/\/103.18.247.248\/~sample\/bri_monitor\/case-study\/gemas-johor-bahru-electrified-double-track-project\/\" data-toggle=\"tooltip\" data-html=\"true\" data-placement=\"top\" data-original-title=\"[G-JB]&lt;br&gt;&lt;br&gt;Relocation issues of residents on the pathway of the railway led to some delays: Through a Statement of Need (SON) Clause 1.8 issued by the Ministry of Transport on the Gemas-Johor Bahru Electrified Double Tracking Project (PLBEG-JB), RAC was given the responsibility to remove all obstructions (squatters) at the project site. A total of 1,306 squatter units of various categories were identified as obstructions to the project and had to be removed.\">OOOOOO<\/a><\/td>\n<td class=\"td-score-2\"><a href=\"http:\/\/103.18.247.248\/~sample\/bri_monitor\/case-study\/the-tatay-river-hydropower-dam\/\" data-toggle=\"tooltip\" data-html=\"true\" data-placement=\"top\" data-original-title=\"[TRHD]&lt;br&gt;&lt;br&gt;7,000,000 m3 of earth removed&lt;br&gt; 900,000 m3 of rock removed&lt;br&gt;&lt;br&gt; 3000ha flooded, 2949 ha flooded permanently per 2010 EIA.&lt;br&gt;&lt;br&gt; 4600ha flooded per 2009 JICA Report.&lt;br&gt;&lt;br&gt; 1600 ha flooded per 2012 &amp; 2020 UNFCC CDM report. &lt;br&gt;&lt;br&gt; Until March 2009, there were no agricultural activities or any developed projects in that area. Along Stung Tatay, there was also no farming there due to a lack of space and freshwater (saltwater). However, it will affect 1594 families both upstream and downstream of Stung Tatay who rely on forest. No families\u2019 relocation caused by this project according to the EIA report.&lt;br&gt;&lt;br&gt; Per the 2009 JICA report 21 villages, home to 1654 families, are within a 40km radius of the project (which they predicted would flood 46km2). Their assessment also described that 84% if the flooded land was forest, while 3% was agriculture.\">OOOOOO<\/a><\/td>\n<td class=\"td-score-4\"><a href=\"http:\/\/103.18.247.248\/~sample\/bri_monitor\/case-study\/letpadaung-copper-mine-project\/\" data-toggle=\"tooltip\" data-html=\"true\" data-placement=\"top\" data-original-title=\"[LCMP]&lt;br&gt;&lt;br&gt;land compensations\/subsidies to Project-affected villagers three times together with the first subsidy, which is three times the market price of the compensation for the crops (between 525,000 and 552,000 Kyats), as guided by the regional government, A total of 3,442.55 acres of land have been taken up by related villagers so far, which totals more than 3.56 billion kyats. Approximately 874 villagers had taken up the subsidies for 2,435.16 acres of land by March 13, 2014.\">OOOOOO<\/a><\/td>\n<td class=\"td-score-5\"><a href=\"http:\/\/103.18.247.248\/~sample\/bri_monitor\/case-study\/the-new-centennial-water-source-kaliwa-dam-project-ncws-kdp\/\" data-toggle=\"tooltip\" data-html=\"true\" data-placement=\"top\" data-original-title=\"[NCWS]&lt;br&gt;&lt;br&gt; \u00b7 Loss of land\/farm area, properties, crops and community facilities including traditional access to these areas and attendant dislocation and loss of income due to right-of-way acquisition &lt;br&gt; \u00b7 Portions of the project area lies within the ancestral domain (AD) of the Dumagat Remontado IPs &lt;br&gt; \u00b7 The ADs covers the Kaliwa Watershed and its river systems with several identified sacred and ritual sites, source of drinking water\">OOOOOO<\/a><\/td>\n<td class=\"td-score-0\"><a href=\"http:\/\/103.18.247.248\/~sample\/bri_monitor\/case-study\/chico-river-pump-irrigation-project-crpip\/\" data-toggle=\"tooltip\" data-html=\"true\" data-placement=\"top\" data-original-title=\"[CRPIP]&lt;br&gt;&lt;br&gt;Not available\">OOOOOO<\/a><\/td>\n<td><\/td>\n<td class=\"td-score-0\"><a href=\"http:\/\/103.18.247.248\/~sample\/bri_monitor\/case-study\/kumul-submarine-cable-network-project-kscnp\/\" data-toggle=\"tooltip\" data-html=\"true\" data-placement=\"top\" data-original-title=\"[KSCNP]&lt;br&gt;&lt;br&gt;Not available\">OOOOOO<\/a><\/td>\n<\/tr>\n<tr>\n<td><span data-toggle=\"tooltip\" data-placement=\"top\" data-original-title=\"Postal and electronic address of the Project Owner\">Contact Details<\/span><\/td>\n<td class=\"td-score-4\"><a href=\"http:\/\/103.18.247.248\/~sample\/bri_monitor\/case-study\/east-coast-railway-link-ecrl\/\" data-toggle=\"tooltip\" data-html=\"true\" data-placement=\"top\" data-original-title=\"[ECRL]&lt;br&gt;&lt;br&gt;Malaysia Rail Link Sdn Bhd&lt;br&gt;Level 15, Menara 1 Dutamas, Solaris Dutamas,&lt;br&gt;No. 1, Jalan Dutamas 1, 50480 Kuala Lumpur&lt;br&gt;&lt;br&gt;Website: http:\/\/www.mrl.com.my&lt;br&gt;General Line: +603 6411 5800 (9am \u2013 5pm)&lt;br&gt;Fax: +603 6411 5822&lt;br&gt;Email: feedback@mrl.com.my\">OOOOOO<\/a><\/td>\n<td class=\"td-score-3\"><a href=\"http:\/\/103.18.247.248\/~sample\/bri_monitor\/case-study\/gemas-johor-bahru-electrified-double-track-project\/\" data-toggle=\"tooltip\" data-html=\"true\" data-placement=\"top\" data-original-title=\"[G-JB]&lt;br&gt;&lt;br&gt;Postal address is: No. 26, Tun Hussein Road, Precinct 4, Federal Government Administrative Centre, 62100 Putrajaya, electronic address for the ministry of transport is aduan@mot.gov.my\">OOOOOO<\/a><\/td>\n<td class=\"td-score-2\"><a href=\"http:\/\/103.18.247.248\/~sample\/bri_monitor\/case-study\/the-tatay-river-hydropower-dam\/\" data-toggle=\"tooltip\" data-html=\"true\" data-placement=\"top\" data-original-title=\"[TRHD]&lt;br&gt;&lt;br&gt;China National Machinery Industry Corporation (Sinomach)&lt;br&gt; No.3 Danling Street, Haidian District, Beijing, P.R.China&lt;br&gt; +86 10 82688888&lt;br&gt; office@sinomach.com.cn&lt;br&gt;&lt;br&gt; China National Heavy Machinery Corporation&lt;br&gt; No. Jia 23 Fu Xing Road Haidian District, Beijing, China&lt;br&gt; 86-10-6821-1861&lt;br&gt; chmc@chmc.cc&lt;br&gt;&lt;br&gt; Cambodian Tatay Hydropower Limited&lt;br&gt; 16, 592, Phum 12, Boeng Kak Pir, Tuol Kouk, Phnom Penh, 12152, Cambodia&lt;br&gt; 855978629182\">OOOOOO<\/a><\/td>\n<td class=\"td-score-4\"><a href=\"http:\/\/103.18.247.248\/~sample\/bri_monitor\/case-study\/letpadaung-copper-mine-project\/\" data-toggle=\"tooltip\" data-html=\"true\" data-placement=\"top\" data-original-title=\"[LCMP]&lt;br&gt;&lt;br&gt;Myanmar Wanbao Mining Company Ltd., Yangon Office&lt;br&gt; 70 (I) Bo Chein Street&lt;br&gt; Pyay Road, Hlaing Township&lt;br&gt; Yangon, Myanmar &lt;br&gt; Tel (951) 654757, 507239\">OOOOOO<\/a><\/td>\n<td class=\"td-score-4\"><a href=\"http:\/\/103.18.247.248\/~sample\/bri_monitor\/case-study\/the-new-centennial-water-source-kaliwa-dam-project-ncws-kdp\/\" data-toggle=\"tooltip\" data-html=\"true\" data-placement=\"top\" data-original-title=\"[NCWS]&lt;br&gt;&lt;br&gt;4th Floor, Administration Building, MWSS Complex, 489 Katipunan Avenue, Balara, Quezon City, 1105\">OOOOOO<\/a><\/td>\n<td class=\"td-score-4\"><a href=\"http:\/\/103.18.247.248\/~sample\/bri_monitor\/case-study\/chico-river-pump-irrigation-project-crpip\/\" data-toggle=\"tooltip\" data-html=\"true\" data-placement=\"top\" data-original-title=\"[CRPIP]&lt;br&gt;&lt;br&gt;Epifanio de los Santos Ave, Diliman, Quezon City, Metro Manila\">OOOOOO<\/a><\/td>\n<td><\/td>\n<td class=\"td-score-4\"><a href=\"http:\/\/103.18.247.248\/~sample\/bri_monitor\/case-study\/kumul-submarine-cable-network-project-kscnp\/\" data-toggle=\"tooltip\" data-html=\"true\" data-placement=\"top\" data-original-title=\"[KSCNP]&lt;br&gt;&lt;br&gt;PNG Dataco &lt;br&gt; Level 1, Wokples Bld, Savanna Heights&lt;br&gt; Waigani,&lt;br&gt; P O Box 1744, Port Moresby&lt;br&gt; Website: http:\/\/www.pngdataco.com&lt;br&gt; General Line: +675 77522093 \">OOOOOO<\/a><\/td>\n<\/tr>\n<tr>\n<td><span data-toggle=\"tooltip\" data-placement=\"top\" data-original-title=\"Name the funding organisation(s)\/sources of funding\">Funding Sources<\/span><\/td>\n<td class=\"td-score-3\"><a href=\"http:\/\/103.18.247.248\/~sample\/bri_monitor\/case-study\/east-coast-railway-link-ecrl\/\" data-toggle=\"tooltip\" data-html=\"true\" data-placement=\"top\" data-original-title=\"[ECRL]&lt;br&gt;&lt;br&gt;Original agreement was: 85% financed through 20-year EXIM Bank loan at 3.25% interest with 7-year moratorium. The residual 15% is government funded through issuance of Sukuk bonds. However, the loan with EXIM bank has been renegotiated during 2019 but the financial\/contract details of which have not been disclosed (as at 30\/6\/2020). 'With the improved ECRL at RM44 billion, the loan amount from China EXIM bank will be reduced substantially. The reduced amount is still being negotiated with China-EXIM Bank and we envisage that this will result in lessening the financial burden of the Government in terms of the principal repayment amount, total interest costs and other fees.'\">OOOOOO<\/a><\/td>\n<td class=\"td-score-2\"><a href=\"http:\/\/103.18.247.248\/~sample\/bri_monitor\/case-study\/gemas-johor-bahru-electrified-double-track-project\/\" data-toggle=\"tooltip\" data-html=\"true\" data-placement=\"top\" data-original-title=\"[G-JB]&lt;br&gt;&lt;br&gt;the Malaysian public through the Federal Malaysian public coffers\">OOOOOO<\/a><\/td>\n<td class=\"td-score-2\"><a href=\"http:\/\/103.18.247.248\/~sample\/bri_monitor\/case-study\/the-tatay-river-hydropower-dam\/\" data-toggle=\"tooltip\" data-html=\"true\" data-placement=\"top\" data-original-title=\"[TRHD]&lt;br&gt;&lt;br&gt;Exim (Export-Import) Bank, China\">OOOOOO<\/a><\/td>\n<td class=\"td-score-4\"><a href=\"http:\/\/103.18.247.248\/~sample\/bri_monitor\/case-study\/letpadaung-copper-mine-project\/\" data-toggle=\"tooltip\" data-html=\"true\" data-placement=\"top\" data-original-title=\"[LCMP]&lt;br&gt;&lt;br&gt;Wanbao Mining Company which runs the mineral business of NORINCO, China North Industries Corporation (Central Govt. SOE)\">OOOOOO<\/a><\/td>\n<td class=\"td-score-5\"><a href=\"http:\/\/103.18.247.248\/~sample\/bri_monitor\/case-study\/the-new-centennial-water-source-kaliwa-dam-project-ncws-kdp\/\" data-toggle=\"tooltip\" data-html=\"true\" data-placement=\"top\" data-original-title=\"[NCWS]&lt;br&gt;&lt;br&gt;Official Development Assistance (ODA) Export-Import Bank of China\">OOOOOO<\/a><\/td>\n<td class=\"td-score-5\"><a href=\"http:\/\/103.18.247.248\/~sample\/bri_monitor\/case-study\/chico-river-pump-irrigation-project-crpip\/\" data-toggle=\"tooltip\" data-html=\"true\" data-placement=\"top\" data-original-title=\"[CRPIP]&lt;br&gt;&lt;br&gt;Official Development Assistance (ODA)&lt;br&gt; Export-Import Bank of China\">OOOOOO<\/a><\/td>\n<td><\/td>\n<td class=\"td-score-4\"><a href=\"http:\/\/103.18.247.248\/~sample\/bri_monitor\/case-study\/kumul-submarine-cable-network-project-kscnp\/\" data-toggle=\"tooltip\" data-html=\"true\" data-placement=\"top\" data-original-title=\"[KSCNP]&lt;br&gt;&lt;br&gt;- EXIM Bank, Peoples Republic of China&lt;br&gt; - Preferential Buyer Credit Loan Agreement on PNG National Submarine Fiber Cable Network project included on collaborative partnership agreement signed between the 2 countries in July 2016.\">OOOOOO<\/a><\/td>\n<\/tr>\n<tr>\n<td><span data-toggle=\"tooltip\" data-placement=\"top\" data-original-title=\"Specify the projected costs\/allocated budget for the project (currency and amount). The budget includes land \/ property acquisition, environmental mitigation measures, H&amp;S provisions, client, consultant &amp; contractor costs, VAT etc.\">Project Budget<\/span><\/td>\n<td class=\"td-score-3\"><a href=\"http:\/\/103.18.247.248\/~sample\/bri_monitor\/case-study\/east-coast-railway-link-ecrl\/\" data-toggle=\"tooltip\" data-html=\"true\" data-placement=\"top\" data-original-title=\"[ECRL]&lt;br&gt;&lt;br&gt;New project cost of RM44,000,000,000 - Full cost details unreleased\">OOOOOO<\/a><\/td>\n<td class=\"td-score-2\"><a href=\"http:\/\/103.18.247.248\/~sample\/bri_monitor\/case-study\/gemas-johor-bahru-electrified-double-track-project\/\" data-toggle=\"tooltip\" data-html=\"true\" data-placement=\"top\" data-original-title=\"\u2022total cost of RM200 million for consultations, RM400 million for coaches.&lt;br&gt;\u2022Forecasts of approximate RM120 million to RM140 million in pretax profit per annum.&lt;br&gt;\u2022From the 2016 budget of this project, US$24 million has been allocated initially to start construction of the project.\">OOOOOO<\/a><\/td>\n<td class=\"td-score-0\"><a href=\"http:\/\/103.18.247.248\/~sample\/bri_monitor\/case-study\/the-tatay-river-hydropower-dam\/\" data-toggle=\"tooltip\" data-html=\"true\" data-placement=\"top\" data-original-title=\"[TRHD]&lt;br&gt;&lt;br&gt;Not available\">OOOOOO<\/a><\/td>\n<td class=\"td-score-2\"><a href=\"http:\/\/103.18.247.248\/~sample\/bri_monitor\/case-study\/letpadaung-copper-mine-project\/\" data-toggle=\"tooltip\" data-html=\"true\" data-placement=\"top\" data-original-title=\"[LCMP]&lt;br&gt;&lt;br&gt;USD 1.065 Billion (USD 2 million annually for CSR project)\">OOOOOO<\/a><\/td>\n<td class=\"td-score-5\"><a href=\"http:\/\/103.18.247.248\/~sample\/bri_monitor\/case-study\/the-new-centennial-water-source-kaliwa-dam-project-ncws-kdp\/\" data-toggle=\"tooltip\" data-html=\"true\" data-placement=\"top\" data-original-title=\"[NCWS]&lt;br&gt;&lt;br&gt;PhP 12.189 Billion\">OOOOOO<\/a><\/td>\n<td class=\"td-score-5\"><a href=\"http:\/\/103.18.247.248\/~sample\/bri_monitor\/case-study\/chico-river-pump-irrigation-project-crpip\/\" data-toggle=\"tooltip\" data-html=\"true\" data-placement=\"top\" data-original-title=\"[CRPIP]&lt;br&gt;&lt;br&gt;Php 4.37 billion\">OOOOOO<\/a><\/td>\n<td><\/td>\n<td class=\"td-score-4\"><a href=\"http:\/\/103.18.247.248\/~sample\/bri_monitor\/case-study\/kumul-submarine-cable-network-project-kscnp\/\" data-toggle=\"tooltip\" data-html=\"true\" data-placement=\"top\" data-original-title=\"[KSCNP]&lt;br&gt;&lt;br&gt;Total project cost estimated at USD270 million (K879 million) - EXIM Bank loan 85% and PNG Government counterpart financing 15%. &lt;br&gt; Funds appropriated through annual budget i.e 2020 K125 million allocated under PNG DataCo, and K35 million allocated under Kumul Consolidated Holdings for Kumul Submarine Cable project.\">OOOOOO<\/a><\/td>\n<\/tr>\n<tr>\n<td><span data-toggle=\"tooltip\" data-placement=\"top\" data-original-title=\"Date project budget was authorised\">Project Budget Approval date<\/span><\/td>\n<td class=\"td-score-3\"><a href=\"http:\/\/103.18.247.248\/~sample\/bri_monitor\/case-study\/east-coast-railway-link-ecrl\/\" data-toggle=\"tooltip\" data-html=\"true\" data-placement=\"top\" data-original-title=\"[ECRL]&lt;br&gt;&lt;br&gt;12\/4\/2019. Supplementary agreement (SA) to the EPCC contract was signed on 12\/4\/2019, stating the project cost at RM44b. The Contract was signed between MRLSB and CCCC, with negotiations led by PM's Special Envoy Daim Zainuddin.\">OOOOOO<\/a><\/td>\n<td class=\"td-score-0\"><a href=\"http:\/\/103.18.247.248\/~sample\/bri_monitor\/case-study\/gemas-johor-bahru-electrified-double-track-project\/\" data-toggle=\"tooltip\" data-html=\"true\" data-placement=\"top\" data-original-title=\"[G-JB]&lt;br&gt;&lt;br&gt;Not available\">OOOOOO<\/a><\/td>\n<td class=\"td-score-0\"><a href=\"http:\/\/103.18.247.248\/~sample\/bri_monitor\/case-study\/the-tatay-river-hydropower-dam\/\" data-toggle=\"tooltip\" data-html=\"true\" data-placement=\"top\" data-original-title=\"[TRHD]&lt;br&gt;&lt;br&gt;Not available\">OOOOOO<\/a><\/td>\n<td class=\"td-score-2\"><a href=\"http:\/\/103.18.247.248\/~sample\/bri_monitor\/case-study\/letpadaung-copper-mine-project\/\" data-toggle=\"tooltip\" data-html=\"true\" data-placement=\"top\" data-original-title=\"[LCMP]&lt;br&gt;&lt;br&gt;Project permit was given for the period (5\/3\/2010 to 5\/3\/2013) first and then 4\/3\/2013 to 4\/3\/2038\">OOOOOO<\/a><\/td>\n<td class=\"td-score-5\"><a href=\"http:\/\/103.18.247.248\/~sample\/bri_monitor\/case-study\/the-new-centennial-water-source-kaliwa-dam-project-ncws-kdp\/\" data-toggle=\"tooltip\" data-html=\"true\" data-placement=\"top\" data-original-title=\"[NCWS]&lt;br&gt;&lt;br&gt;Approved by the NEDA Board of the NCWS-KDP under Official Development Assistance (ODA) from China on 27 June 2017\">OOOOOO<\/a><\/td>\n<td class=\"td-score-5\"><a href=\"http:\/\/103.18.247.248\/~sample\/bri_monitor\/case-study\/chico-river-pump-irrigation-project-crpip\/\" data-toggle=\"tooltip\" data-html=\"true\" data-placement=\"top\" data-original-title=\"[CRPIP]&lt;br&gt;&lt;br&gt;The CRPIP and its budget was approved by the Investment Coordination Committee on 28 Sep 2016\">OOOOOO<\/a><\/td>\n<td><\/td>\n<td class=\"td-score-5\"><a href=\"http:\/\/103.18.247.248\/~sample\/bri_monitor\/case-study\/kumul-submarine-cable-network-project-kscnp\/\" data-toggle=\"tooltip\" data-html=\"true\" data-placement=\"top\" data-original-title=\"[KSCNP]&lt;br&gt;&lt;br&gt;Project started in October 2018 following NEC approval for EXIM Bank Loan financing and arrival of 5,600 KM submarine optic cable from China National Machinery Import and Export Corporation. Phase 1, system 2 connecting Port Moresby, Alotau, Popodetta, Lae and Madang expected to be completed by February 2019. Phase 2, system 1 connecting Madang, Wewak, Vanimo, and New Guinea islands anticipated to be completed by end 2019.\">OOOOOO<\/a><\/td>\n<\/tr>\n<tr>\n<td><span data-toggle=\"tooltip\" data-placement=\"top\" data-original-title=\"The current stage of the project. Select from identification, preparation, construction, completion, completed or cancelled.\">Project Status<\/span><\/td>\n<td class=\"td-score-2\"><a href=\"http:\/\/103.18.247.248\/~sample\/bri_monitor\/case-study\/east-coast-railway-link-ecrl\/\" data-toggle=\"tooltip\" data-html=\"true\" data-placement=\"top\" data-original-title=\"[ECRL]&lt;br&gt;&lt;br&gt;Live, construction stage\">OOOOOO<\/a><\/td>\n<td class=\"td-score-2\"><a href=\"http:\/\/103.18.247.248\/~sample\/bri_monitor\/case-study\/gemas-johor-bahru-electrified-double-track-project\/\" data-toggle=\"tooltip\" data-html=\"true\" data-placement=\"top\" data-original-title=\"[G-JB]&lt;br&gt;&lt;br&gt;Ongoing; construction\">OOOOOO<\/a><\/td>\n<td class=\"td-score-2\"><a href=\"http:\/\/103.18.247.248\/~sample\/bri_monitor\/case-study\/the-tatay-river-hydropower-dam\/\" data-toggle=\"tooltip\" data-html=\"true\" data-placement=\"top\" data-original-title=\"[TRHD]&lt;br&gt;&lt;br&gt;Completed\">OOOOOO<\/a><\/td>\n<td class=\"td-score-2\"><a href=\"http:\/\/103.18.247.248\/~sample\/bri_monitor\/case-study\/letpadaung-copper-mine-project\/\" data-toggle=\"tooltip\" data-html=\"true\" data-placement=\"top\" data-original-title=\"[LCMP]&lt;br&gt;&lt;br&gt;Production stage after amendment of Product Sharing Contract in July 2013 and ESIA done by Australian Consulting Firm\">OOOOOO<\/a><\/td>\n<td class=\"td-score-3\"><a href=\"http:\/\/103.18.247.248\/~sample\/bri_monitor\/case-study\/the-new-centennial-water-source-kaliwa-dam-project-ncws-kdp\/\" data-toggle=\"tooltip\" data-html=\"true\" data-placement=\"top\" data-original-title=\"[NCWS]&lt;br&gt;&lt;br&gt;9.44% overall accomplishment (as of March 2021)\">OOOOOO<\/a><\/td>\n<td class=\"td-score-3\"><a href=\"http:\/\/103.18.247.248\/~sample\/bri_monitor\/case-study\/chico-river-pump-irrigation-project-crpip\/\" data-toggle=\"tooltip\" data-html=\"true\" data-placement=\"top\" data-original-title=\"[CRPIP]&lt;br&gt;&lt;br&gt;47% of the contract had been completed\">OOOOOO<\/a><\/td>\n<td><\/td>\n<td class=\"td-score-4\"><a href=\"http:\/\/103.18.247.248\/~sample\/bri_monitor\/case-study\/kumul-submarine-cable-network-project-kscnp\/\" data-toggle=\"tooltip\" data-html=\"true\" data-placement=\"top\" data-original-title=\"[KSCNP]&lt;br&gt;&lt;br&gt;With System 3 (Port Moresby, Kerema, Daru) Complete, and project moved into system integration, testing and commissioning, as of 2 June 2020.\">OOOOOO<\/a><\/td>\n<\/tr>\n<tr>\n<td><span data-toggle=\"tooltip\" data-placement=\"top\" data-original-title=\"State projected or actual completion cost (currency and amount)\">Completion Cost<\/span><\/td>\n<td class=\"td-score-4\"><a href=\"http:\/\/103.18.247.248\/~sample\/bri_monitor\/case-study\/east-coast-railway-link-ecrl\/\" data-toggle=\"tooltip\" data-html=\"true\" data-placement=\"top\" data-original-title=\"[ECRL]&lt;br&gt;&lt;br&gt;New project cost of RM44,000,000,000 - Full cost details unreleased\">OOOOOO<\/a><\/td>\n<td class=\"td-score-2\"><a href=\"http:\/\/103.18.247.248\/~sample\/bri_monitor\/case-study\/gemas-johor-bahru-electrified-double-track-project\/\" data-toggle=\"tooltip\" data-html=\"true\" data-placement=\"top\" data-original-title=\"[G-JB]&lt;br&gt;&lt;br&gt;installation of the Gemas-Johor Baharu electrified double-tracking project, starting next year, is expected to cost RM7.13 billion.\">OOOOOO<\/a><\/td>\n<td class=\"td-score-2\"><a href=\"http:\/\/103.18.247.248\/~sample\/bri_monitor\/case-study\/the-tatay-river-hydropower-dam\/\" data-toggle=\"tooltip\" data-html=\"true\" data-placement=\"top\" data-original-title=\"[TRHD]&lt;br&gt;&lt;br&gt;Projected cost: &lt;br&gt; SINOMACH 2009 report: $505 million USD&lt;br&gt; 2012 PDD of CDM: $482,460,000 ($482 million USD)&lt;br&gt; International Rivers, Rivers Coalition in Cambodia (Jan 2008) JICA (Jan 2009), RUPP Study (2013):&lt;br&gt; $215 million USD&lt;br&gt; Actual cost: $540 million USD\">OOOOOO<\/a><\/td>\n<td class=\"td-score-4\"><a href=\"http:\/\/103.18.247.248\/~sample\/bri_monitor\/case-study\/letpadaung-copper-mine-project\/\" data-toggle=\"tooltip\" data-html=\"true\" data-placement=\"top\" data-original-title=\"[LCMP]&lt;br&gt;&lt;br&gt;USD 1.065 Billion (USD 2 million annually for CSR project)\">OOOOOO<\/a><\/td>\n<td class=\"td-score-5\"><a href=\"http:\/\/103.18.247.248\/~sample\/bri_monitor\/case-study\/the-new-centennial-water-source-kaliwa-dam-project-ncws-kdp\/\" data-toggle=\"tooltip\" data-html=\"true\" data-placement=\"top\" data-original-title=\"[NCWS]&lt;br&gt;&lt;br&gt;PhP 12.189 Billion\">OOOOOO<\/a><\/td>\n<td class=\"td-score-5\"><a href=\"http:\/\/103.18.247.248\/~sample\/bri_monitor\/case-study\/chico-river-pump-irrigation-project-crpip\/\" data-toggle=\"tooltip\" data-html=\"true\" data-placement=\"top\" data-original-title=\"[CRPIP]&lt;br&gt;&lt;br&gt;PhP 4.37 Billion\">OOOOOO<\/a><\/td>\n<td><\/td>\n<td class=\"td-score-0\"><\/td>\n<\/tr>\n<tr>\n<td><span data-toggle=\"tooltip\" data-placement=\"top\" data-original-title=\"State projected or actual completion date\">Completion Date<\/span><\/td>\n<td class=\"td-score-3\"><a href=\"http:\/\/103.18.247.248\/~sample\/bri_monitor\/case-study\/east-coast-railway-link-ecrl\/\" data-toggle=\"tooltip\" data-html=\"true\" data-placement=\"top\" data-original-title=\"[ECRL]&lt;br&gt;&lt;br&gt;31\/12\/2026\">OOOOOO<\/a><\/td>\n<td class=\"td-score-2\"><a href=\"http:\/\/103.18.247.248\/~sample\/bri_monitor\/case-study\/gemas-johor-bahru-electrified-double-track-project\/\" data-toggle=\"tooltip\" data-html=\"true\" data-placement=\"top\" data-original-title=\"\u2022 October 2021 was the projected date but the Corona Virus lockdown occured and Malaysia went into a movement control order.&lt;br&gt;\u2022 Thus, the date of completion is October 2022. \">OOOOOO<\/a><\/td>\n<td class=\"td-score-2\"><a href=\"http:\/\/103.18.247.248\/~sample\/bri_monitor\/case-study\/the-tatay-river-hydropower-dam\/\" data-toggle=\"tooltip\" data-html=\"true\" data-placement=\"top\" data-original-title=\"[TRHD]&lt;br&gt;&lt;br&gt;SINOMACH&lt;br&gt; Construction initiation date: May 21st, 2009 &lt;br&gt; Projected completion date: end of 2013&lt;br&gt;&lt;br&gt; UNFCC CDM Project Description&lt;br&gt; Main dam construction contract signed May 22nd, 2010&lt;br&gt;&lt;br&gt; China Aid Data&lt;br&gt; Construction started March 2010&lt;br&gt; Initial Operation began August 2014&lt;br&gt;&lt;br&gt; Phnom Penh Post&lt;br&gt; Electricity generation began August 15th, 2014&lt;br&gt;&lt;br&gt; China Gezhouba Group, Ltd. &lt;br&gt; Fully operational inauguration ceremony on December 23rd, 2015\">OOOOOO<\/a><\/td>\n<td class=\"td-score-2\"><a href=\"http:\/\/103.18.247.248\/~sample\/bri_monitor\/case-study\/letpadaung-copper-mine-project\/\" data-toggle=\"tooltip\" data-html=\"true\" data-placement=\"top\" data-original-title=\"[LCMP]&lt;br&gt;&lt;br&gt;The first permit period is from 2010 to 2013 and the second term mining permit is given for 25 years from 2013 to 2038. However, because of protests by residents, the project agreement was amended in 2013 and the copper could be produced in March 2016.\">OOOOOO<\/a><\/td>\n<td class=\"td-score-4\"><a href=\"http:\/\/103.18.247.248\/~sample\/bri_monitor\/case-study\/the-new-centennial-water-source-kaliwa-dam-project-ncws-kdp\/\" data-toggle=\"tooltip\" data-html=\"true\" data-placement=\"top\" data-original-title=\"[NCWS]&lt;br&gt;&lt;br&gt;2020-2025\">OOOOOO<\/a><\/td>\n<td class=\"td-score-4\"><a href=\"http:\/\/103.18.247.248\/~sample\/bri_monitor\/case-study\/chico-river-pump-irrigation-project-crpip\/\" data-toggle=\"tooltip\" data-html=\"true\" data-placement=\"top\" data-original-title=\"[CRPIP]&lt;br&gt;&lt;br&gt;44531\">OOOOOO<\/a><\/td>\n<td><\/td>\n<td class=\"td-score-4\"><a href=\"http:\/\/103.18.247.248\/~sample\/bri_monitor\/case-study\/kumul-submarine-cable-network-project-kscnp\/\" data-toggle=\"tooltip\" data-html=\"true\" data-placement=\"top\" data-original-title=\"[KSCNP]&lt;br&gt;&lt;br&gt;Phase 1 connecting Port Moresby to Madang with landing stations in Alotau, Lae and Madang expected to be completed by February 2019; Phase 2 connecting Madang to Wewak, Vanimo, Manus, Kavieng, Kimbe, Rabaul and Kieta expected to be completed by end 2019.\">OOOOOO<\/a><\/td>\n<\/tr>\n<tr>\n<td><span data-toggle=\"tooltip\" data-placement=\"top\" data-original-title=\"Indicate projected or actual scope of project. Aim is to show if the completed project scope differs from the original project scope. Specify main outputs (type, quantity, unit)\">Scope of Completion<\/span><\/td>\n<td class=\"td-score-3\"><a href=\"http:\/\/103.18.247.248\/~sample\/bri_monitor\/case-study\/east-coast-railway-link-ecrl\/\" data-toggle=\"tooltip\" data-html=\"true\" data-placement=\"top\" data-original-title=\"[ECRL]&lt;br&gt;&lt;br&gt;Key outputs have been disclosed, but full details unreleased:&lt;br \/&gt; &lt;br&gt;- Standard gauge and souble tracking&lt;br&gt;- 640km inclusive of spur lines&lt;br&gt;- 20 stations, passing through 5 states&lt;br&gt;- Link between Kuantan Port and Port Klang&lt;br&gt;- 3 interchange stations - Putrajaya Sentral, Bangi\/Kajang, Mentakab\">OOOOOO<\/a><\/td>\n<td class=\"td-score-4\"><a href=\"http:\/\/103.18.247.248\/~sample\/bri_monitor\/case-study\/gemas-johor-bahru-electrified-double-track-project\/\" data-toggle=\"tooltip\" data-html=\"true\" data-placement=\"top\" data-original-title=\"\u2022 Through the project, 22 train services should pass through daily.&lt;br&gt;\u2022 Designated train speed of 160km\/h.&lt;br&gt;\u2022 There is a seating capacity of 346 passengers per train.&lt;br&gt;\u2022 This project will pass from Gemas towards Johor Bahru covering 11 stations.\">OOOOOO<\/a><\/td>\n<td class=\"td-score-2\"><a href=\"http:\/\/103.18.247.248\/~sample\/bri_monitor\/case-study\/the-tatay-river-hydropower-dam\/\" data-toggle=\"tooltip\" data-html=\"true\" data-placement=\"top\" data-original-title=\"[TRHD]&lt;br&gt;&lt;br&gt;Total Investment:&lt;br&gt; EIA and news: $540 m&lt;br&gt; SINOMACH 2009 report: $505 million PDD of CDM: $482,460,000 ($482m)&lt;br&gt; Project\u2019s estimated cost by International Rivers, River Coalition in Cambodia &amp; JICA: $215 million&lt;br&gt;&lt;br&gt; Project Scope:&lt;br&gt; International Rivers &amp; JICA: &lt;br&gt; 33 km2 reservoir area&lt;br&gt; 55 m dam height&lt;br&gt; 80 MW production capacity&lt;br&gt; 416 GWh\/yr annual production&lt;br&gt;&lt;br&gt; China Gezhouba Group Co., Ltd.:&lt;br&gt; 170 m dam height&lt;br&gt; 246 MW production capacity&lt;br&gt; 846 GWh\/yr annual production\">OOOOOO<\/a><\/td>\n<td class=\"td-score-2\"><a href=\"http:\/\/103.18.247.248\/~sample\/bri_monitor\/case-study\/letpadaung-copper-mine-project\/\" data-toggle=\"tooltip\" data-html=\"true\" data-placement=\"top\" data-original-title=\"[LCMP]&lt;br&gt;&lt;br&gt;Original agreement with Wanbao - Investment \u2013 997 million USD (Capital Cost \u2013 912 million) 4% Royalty, 8 % Commercial tax 8% and Income tax 15 % then, amended project gave a 30% share of the eventual profits, 19% going to UMEHL, a massive military-owned company and 51% to Myanmar\u2019s government. A later agreement gave 2% of profits to local development. The project is reported to have cost approximately $1 billion to develop.\">OOOOOO<\/a><\/td>\n<td class=\"td-score-0\"><a href=\"http:\/\/103.18.247.248\/~sample\/bri_monitor\/case-study\/the-new-centennial-water-source-kaliwa-dam-project-ncws-kdp\/\" data-toggle=\"tooltip\" data-html=\"true\" data-placement=\"top\" data-original-title=\"[NCWS]&lt;br&gt;&lt;br&gt;Not available\">OOOOOO<\/a><\/td>\n<td class=\"td-score-4\"><a href=\"http:\/\/103.18.247.248\/~sample\/bri_monitor\/case-study\/chico-river-pump-irrigation-project-crpip\/\" data-toggle=\"tooltip\" data-html=\"true\" data-placement=\"top\" data-original-title=\"[CRPIP]&lt;br&gt;&lt;br&gt;Upon completion within three years, it will provide a stable supply of water to around 8700 hectares of agricultural land, benefiting 4350 households in 21 barangays in the Kalinga Province and Cagayan Province in Northern Luzon and create hundreds of employment opportunities for the local people.\">OOOOOO<\/a><\/td>\n<td><\/td>\n<td class=\"td-score-4\"><a href=\"http:\/\/103.18.247.248\/~sample\/bri_monitor\/case-study\/kumul-submarine-cable-network-project-kscnp\/\" data-toggle=\"tooltip\" data-html=\"true\" data-placement=\"top\" data-original-title=\"[KSCNP]&lt;br&gt;&lt;br&gt;Project was completed with the 3rd phase or system 3 covering Port Moresby, Kerema and Daru and completion of the project in June 2020 instead of earlier anticipated end 2019.\">OOOOOO<\/a><\/td>\n<\/tr>\n<tr>\n<td><span data-toggle=\"tooltip\" data-placement=\"top\" data-original-title=\"Summary of primary reasons for any changes in scope, time and cost\">Reasons for Project Changes<\/span><\/td>\n<td class=\"td-score-3\"><a href=\"http:\/\/103.18.247.248\/~sample\/bri_monitor\/case-study\/east-coast-railway-link-ecrl\/\" data-toggle=\"tooltip\" data-html=\"true\" data-placement=\"top\" data-original-title=\"[ECRL]&lt;br&gt;&lt;br&gt;The PH Government\u2019s main objection to the original East Coast Rail Link (ECRL) project was premised on the way and speed at which the original contract was negotiated and signed in 2016. It was an unjustified, hefty lump sum price which lacked clarity in terms of technical specifications, price and, by extension, economic justification.\">OOOOOO<\/a><\/td>\n<td class=\"td-score-2\"><a href=\"http:\/\/103.18.247.248\/~sample\/bri_monitor\/case-study\/gemas-johor-bahru-electrified-double-track-project\/\" data-toggle=\"tooltip\" data-html=\"true\" data-placement=\"top\" data-original-title=\"\u2022Changes in cost were due to the fact there was a change in government.&lt;br&gt;\u2022There was a change in timing because of the occurence of the Corona Virus, thus further delaying the project.\">OOOOOO<\/a><\/td>\n<td class=\"td-score-0\"><a href=\"http:\/\/103.18.247.248\/~sample\/bri_monitor\/case-study\/the-tatay-river-hydropower-dam\/\" data-toggle=\"tooltip\" data-html=\"true\" data-placement=\"top\" data-original-title=\"[TRHD]&lt;br&gt;&lt;br&gt;Not available\">OOOOOO<\/a><\/td>\n<td class=\"td-score-2\"><a href=\"http:\/\/103.18.247.248\/~sample\/bri_monitor\/case-study\/letpadaung-copper-mine-project\/\" data-toggle=\"tooltip\" data-html=\"true\" data-placement=\"top\" data-original-title=\"[LCMP]&lt;br&gt;&lt;br&gt;After protests by the villagers and recommendations of investigation committee led by Daw Aung San Suu Kyi, Wanbao agreed to amend the agreement.\">OOOOOO<\/a><\/td>\n<td class=\"td-score-0\"><a href=\"http:\/\/103.18.247.248\/~sample\/bri_monitor\/case-study\/the-new-centennial-water-source-kaliwa-dam-project-ncws-kdp\/\" data-toggle=\"tooltip\" data-html=\"true\" data-placement=\"top\" data-original-title=\"[NCWS]&lt;br&gt;&lt;br&gt;Not available\">OOOOOO<\/a><\/td>\n<td class=\"td-score-0\"><a href=\"http:\/\/103.18.247.248\/~sample\/bri_monitor\/case-study\/chico-river-pump-irrigation-project-crpip\/\" data-toggle=\"tooltip\" data-html=\"true\" data-placement=\"top\" data-original-title=\"[CRPIP]&lt;br&gt;&lt;br&gt;Not available.\">OOOOOO<\/a><\/td>\n<td><\/td>\n<td class=\"td-score-0\"><a href=\"http:\/\/103.18.247.248\/~sample\/bri_monitor\/case-study\/kumul-submarine-cable-network-project-kscnp\/\" data-toggle=\"tooltip\" data-html=\"true\" data-placement=\"top\" data-original-title=\"[KSCNP]&lt;br&gt;&lt;br&gt;Not available\">OOOOOO<\/a><\/td>\n<\/tr>\n<tr>\n<td><span data-toggle=\"tooltip\" data-placement=\"top\" data-original-title=\"Reference to publicly available technical and financial audits\">Reference to Audit &amp; Evaluation<\/span><\/td>\n<td class=\"td-score-0\"><a href=\"http:\/\/103.18.247.248\/~sample\/bri_monitor\/case-study\/east-coast-railway-link-ecrl\/\" data-toggle=\"tooltip\" data-html=\"true\" data-placement=\"top\" data-original-title=\"[ECRL]&lt;br&gt;&lt;br&gt;Not available\">OOOOOO<\/a><\/td>\n<td class=\"td-score-0\"><a href=\"http:\/\/103.18.247.248\/~sample\/bri_monitor\/case-study\/gemas-johor-bahru-electrified-double-track-project\/\" data-toggle=\"tooltip\" data-html=\"true\" data-placement=\"top\" data-original-title=\"[G-JB]&lt;br&gt;&lt;br&gt;Not available\">OOOOOO<\/a><\/td>\n<td class=\"td-score-0\"><a href=\"http:\/\/103.18.247.248\/~sample\/bri_monitor\/case-study\/the-tatay-river-hydropower-dam\/\" data-toggle=\"tooltip\" data-html=\"true\" data-placement=\"top\" data-original-title=\"[TRHD]&lt;br&gt;&lt;br&gt;Not available\">OOOOOO<\/a><\/td>\n<td class=\"td-score-2\"><a href=\"http:\/\/103.18.247.248\/~sample\/bri_monitor\/case-study\/letpadaung-copper-mine-project\/\" data-toggle=\"tooltip\" data-html=\"true\" data-placement=\"top\" data-original-title=\"[LCMP]&lt;br&gt;&lt;br&gt;Only ESIA report and Letpadaung Taung Investigation Commission Report\">OOOOOO<\/a><\/td>\n<td class=\"td-score-4\"><a href=\"http:\/\/103.18.247.248\/~sample\/bri_monitor\/case-study\/the-new-centennial-water-source-kaliwa-dam-project-ncws-kdp\/\" data-toggle=\"tooltip\" data-html=\"true\" data-placement=\"top\" data-original-title=\"[NCWS]&lt;br&gt;&lt;br&gt;\u00b7 Consolidated Audit Report on Official Development Assistance Funded Programs and Projects&lt;br&gt; \u00b7 MWSS statement on COA observations&lt;br&gt; \u00b7 MWSS audit and observations\">OOOOOO<\/a><\/td>\n<td class=\"td-score-0\"><a href=\"http:\/\/103.18.247.248\/~sample\/bri_monitor\/case-study\/chico-river-pump-irrigation-project-crpip\/\" data-toggle=\"tooltip\" data-html=\"true\" data-placement=\"top\" data-original-title=\"[CRPIP]&lt;br&gt;&lt;br&gt;Not available.\">OOOOOO<\/a><\/td>\n<td><\/td>\n<td class=\"td-score-0\"><a href=\"http:\/\/103.18.247.248\/~sample\/bri_monitor\/case-study\/kumul-submarine-cable-network-project-kscnp\/\" data-toggle=\"tooltip\" data-html=\"true\" data-placement=\"top\" data-original-title=\"[KSCNP]&lt;br&gt;&lt;br&gt;Not available\">OOOOOO<\/a><\/td>\n<\/tr>\n<tr>\n<td><span data-toggle=\"tooltip\" data-placement=\"top\" data-original-title=\"Enter name of the organisation carrying out the procurement\">Procuring Entity<\/span><\/td>\n<td class=\"td-score-2\"><a href=\"http:\/\/103.18.247.248\/~sample\/bri_monitor\/case-study\/east-coast-railway-link-ecrl\/\" data-toggle=\"tooltip\" data-html=\"true\" data-placement=\"top\" data-original-title=\"[ECRL]&lt;br&gt;&lt;br&gt;EPCC: China Communications Construction Co Ltd; China Communications Construction Company (M) Sdn Bhd&lt;br&gt;Study Consultant: HSS Engineers Berhad&lt;br&gt;Project Owner: Malaysia Rail Link Sdn Bhd&lt;br&gt;Project Manager: AECOM; HSS Integrated Sdn Bhd&lt;br&gt;Planning Authority: ECERD; SPAD; MOT&lt;br&gt;Design Consultant: HSS Integrated Sdn Bhd\">OOOOOO<\/a><\/td>\n<td class=\"td-score-2\"><a href=\"http:\/\/103.18.247.248\/~sample\/bri_monitor\/case-study\/gemas-johor-bahru-electrified-double-track-project\/\" data-toggle=\"tooltip\" data-html=\"true\" data-placement=\"top\" data-original-title=\"\u2022Ministry of Transport together with the consortium of three Chinese contractors&lt;br&gt;\u2022China Communications Construction Co Ltd&lt;br&gt;\u2022China Railway Construction Corporation Ltd \u2022China Railway Engineering Corporation\">OOOOOO<\/a><\/td>\n<td class=\"td-score-2\"><a href=\"http:\/\/103.18.247.248\/~sample\/bri_monitor\/case-study\/the-tatay-river-hydropower-dam\/\" data-toggle=\"tooltip\" data-html=\"true\" data-placement=\"top\" data-original-title=\"[TRHD]&lt;br&gt;&lt;br&gt;China National Heavy Machinery Corporation\">OOOOOO<\/a><\/td>\n<td class=\"td-score-4\"><a href=\"http:\/\/103.18.247.248\/~sample\/bri_monitor\/case-study\/letpadaung-copper-mine-project\/\" data-toggle=\"tooltip\" data-html=\"true\" data-placement=\"top\" data-original-title=\"[LCMP]&lt;br&gt;&lt;br&gt;No.(1) Mining Enterprise, Ministry of Natural Resources and Environmental Conservation,\">OOOOOO<\/a><\/td>\n<td class=\"td-score-4\"><a href=\"http:\/\/103.18.247.248\/~sample\/bri_monitor\/case-study\/the-new-centennial-water-source-kaliwa-dam-project-ncws-kdp\/\" data-toggle=\"tooltip\" data-html=\"true\" data-placement=\"top\" data-original-title=\"[NCWS]&lt;br&gt;&lt;br&gt;Metropolitan Waterworks and Sewerage System (MWSS)\">OOOOOO<\/a><\/td>\n<td class=\"td-score-4\"><a href=\"http:\/\/103.18.247.248\/~sample\/bri_monitor\/case-study\/chico-river-pump-irrigation-project-crpip\/\" data-toggle=\"tooltip\" data-html=\"true\" data-placement=\"top\" data-original-title=\"[CRPIP]&lt;br&gt;&lt;br&gt;National Irrigation Authority (NIA)\">OOOOOO<\/a><\/td>\n<td><\/td>\n<td class=\"td-score-4\"><a href=\"http:\/\/103.18.247.248\/~sample\/bri_monitor\/case-study\/kumul-submarine-cable-network-project-kscnp\/\" data-toggle=\"tooltip\" data-html=\"true\" data-placement=\"top\" data-original-title=\"[KSCNP]&lt;br&gt;&lt;br&gt;Kumul Consolidated Holdings\">OOOOOO<\/a><\/td>\n<\/tr>\n<tr>\n<td><span data-toggle=\"tooltip\" data-placement=\"top\" data-original-title=\"Postal and Electronic address\">Procuring Entity Contact Details<\/span><\/td>\n<td class=\"td-score-2\"><a href=\"http:\/\/103.18.247.248\/~sample\/bri_monitor\/case-study\/east-coast-railway-link-ecrl\/\" data-toggle=\"tooltip\" data-html=\"true\" data-placement=\"top\" data-original-title=\"[ECRL]&lt;br&gt;&lt;br&gt;Block A5, Level 13A, Menara 1 Dutamas,&lt;br&gt;Solaris Dutamas, No. 1, Jalan Dutamas 1,&lt;br&gt;50480 Kuala Lumpur, Malaysia.&lt;br&gt;&lt;br&gt;Tel: +603-62063965&lt;br&gt;Email: enquiry@cccecrl.com\">OOOOOO<\/a><\/td>\n<td class=\"td-score-2\"><a href=\"http:\/\/103.18.247.248\/~sample\/bri_monitor\/case-study\/gemas-johor-bahru-electrified-double-track-project\/\" data-toggle=\"tooltip\" data-html=\"true\" data-placement=\"top\" data-original-title=\"\u2022The address for the China Communications Construction company in Malaysia is: Level 10, Menara 1 Dutamas, Solaris Dutamas, No. 1 Jalan Dutamas 1, 50480 Kuala Lumpur, Malaysia. Their email address is kl.management@cccc.com.my.&lt;br&gt;\u2022The address for the China Railway Construction Corporation is No. 40 Fuxing road, 100855, China and their email address is webmaster@crcc.cn&lt;br&gt;\u2022The address of the China Railway Engineering Corporation is No.69, Fuxing Road, Haidian district 100039,China and their email address is crecwebmaster@163.com \">OOOOOO<\/a><\/td>\n<td class=\"td-score-2\"><a href=\"http:\/\/103.18.247.248\/~sample\/bri_monitor\/case-study\/the-tatay-river-hydropower-dam\/\" data-toggle=\"tooltip\" data-html=\"true\" data-placement=\"top\" data-original-title=\"[TRHD]&lt;br&gt;&lt;br&gt;No. Jia 23 Fu Xing Road Haidian District, Beijing, China&lt;br&gt; 86-10-6821-1861&lt;br&gt; chmc@chmc.cc&lt;br&gt; office@sinomach.com.cn\">OOOOOO<\/a><\/td>\n<td class=\"td-score-4\"><a href=\"http:\/\/103.18.247.248\/~sample\/bri_monitor\/case-study\/letpadaung-copper-mine-project\/\" data-toggle=\"tooltip\" data-html=\"true\" data-placement=\"top\" data-original-title=\"[LCMP]&lt;br&gt;&lt;br&gt;Office Building No.(19), Nay Pyi Taw, meone@e-mining.gov.mm\">OOOOOO<\/a><\/td>\n<td class=\"td-score-4\"><a href=\"http:\/\/103.18.247.248\/~sample\/bri_monitor\/case-study\/the-new-centennial-water-source-kaliwa-dam-project-ncws-kdp\/\" data-toggle=\"tooltip\" data-html=\"true\" data-placement=\"top\" data-original-title=\"[NCWS]&lt;br&gt;&lt;br&gt;4th Floor, Administration Building, MWSS Complex, 489 Katipunan Avenue, Balara, Quezon City, 1105\">OOOOOO<\/a><\/td>\n<td class=\"td-score-4\"><a href=\"http:\/\/103.18.247.248\/~sample\/bri_monitor\/case-study\/chico-river-pump-irrigation-project-crpip\/\" data-toggle=\"tooltip\" data-html=\"true\" data-placement=\"top\" data-original-title=\"[CRPIP]&lt;br&gt;&lt;br&gt;Epifanio de los Santos Ave, Diliman, Quezon City, Metro Manila\">OOOOOO<\/a><\/td>\n<td><\/td>\n<td class=\"td-score-4\"><a href=\"http:\/\/103.18.247.248\/~sample\/bri_monitor\/case-study\/kumul-submarine-cable-network-project-kscnp\/\" data-toggle=\"tooltip\" data-html=\"true\" data-placement=\"top\" data-original-title=\"[KSCNP]&lt;br&gt;&lt;br&gt;Kumul Consolidated Holdings&lt;br&gt; 3rd Floor, Harbour Side West, Stanley Esplanade&lt;br&gt; P O Box 320, NCD, PNG&lt;br&gt; Phone (675) 3212977, (675) 3212019\">OOOOOO<\/a><\/td>\n<\/tr>\n<tr>\n<td><span data-toggle=\"tooltip\" data-placement=\"top\" data-original-title=\"Develop a list such as International Competitive Bidding, National Competitive Bidding, Donor Procurement Rules, Framework, Direct Award\">Procurement Process<\/span><\/td>\n<td class=\"td-score-2\"><a href=\"http:\/\/103.18.247.248\/~sample\/bri_monitor\/case-study\/east-coast-railway-link-ecrl\/\" data-toggle=\"tooltip\" data-html=\"true\" data-placement=\"top\" data-original-title=\"[ECRL]&lt;br&gt;&lt;br&gt;Contract to CCCC was done through direct award&lt;br&gt;CCCC's procurement of materials and equipment (40% to locals) are done via competitive bidding with a shortlist of suppliers selected after pre-qualification phase\">OOOOOO<\/a><\/td>\n<td class=\"td-score-2\"><a href=\"http:\/\/103.18.247.248\/~sample\/bri_monitor\/case-study\/gemas-johor-bahru-electrified-double-track-project\/\" data-toggle=\"tooltip\" data-html=\"true\" data-placement=\"top\" data-original-title=\"[G-JB]&lt;br&gt;&lt;br&gt;Contract was directly awarded with a percentage ownership breakdown of the chinese consortium is between CREC:CRCC:CCCC is 40:30:30.\">OOOOOO<\/a><\/td>\n<td class=\"td-score-2\"><a href=\"http:\/\/103.18.247.248\/~sample\/bri_monitor\/case-study\/the-tatay-river-hydropower-dam\/\" data-toggle=\"tooltip\" data-html=\"true\" data-placement=\"top\" data-original-title=\"[TRHD]&lt;br&gt;&lt;br&gt;Unsolicited Proposal&lt;br&gt; Direct Negotiation Contract Award\">OOOOOO<\/a><\/td>\n<td class=\"td-score-4\"><a href=\"http:\/\/103.18.247.248\/~sample\/bri_monitor\/case-study\/letpadaung-copper-mine-project\/\" data-toggle=\"tooltip\" data-html=\"true\" data-placement=\"top\" data-original-title=\"[LCMP]&lt;br&gt;&lt;br&gt;Ivanhoe, Canadian Mining Company sold its share to Wanbao citing the impact of the negative stigma of working with the military government on its other business throughout the world in 2011mm\">OOOOOO<\/a><\/td>\n<td class=\"td-score-2\"><a href=\"http:\/\/103.18.247.248\/~sample\/bri_monitor\/case-study\/the-new-centennial-water-source-kaliwa-dam-project-ncws-kdp\/\" data-toggle=\"tooltip\" data-html=\"true\" data-placement=\"top\" data-original-title=\"[NCWS]&lt;br&gt;&lt;br&gt;National Competitive Bidding Process\">OOOOOO<\/a><\/td>\n<td class=\"td-score-0\"><a href=\"http:\/\/103.18.247.248\/~sample\/bri_monitor\/case-study\/chico-river-pump-irrigation-project-crpip\/\" data-toggle=\"tooltip\" data-html=\"true\" data-placement=\"top\" data-original-title=\"[CRPIP]&lt;br&gt;&lt;br&gt;Not available\">OOOOOO<\/a><\/td>\n<td><\/td>\n<td class=\"td-score-0\"><a href=\"http:\/\/103.18.247.248\/~sample\/bri_monitor\/case-study\/kumul-submarine-cable-network-project-kscnp\/\" data-toggle=\"tooltip\" data-html=\"true\" data-placement=\"top\" data-original-title=\"[KSCNP]&lt;br&gt;&lt;br&gt;Not avilable\">OOOOOO<\/a><\/td>\n<\/tr>\n<tr>\n<td><span data-toggle=\"tooltip\" data-placement=\"top\" data-original-title=\"Develop a list such as Design, Supervision, Design &amp; Supervision, Design &amp; Build, Construction\">Contract Type<\/span><\/td>\n<td class=\"td-score-5\"><a href=\"http:\/\/103.18.247.248\/~sample\/bri_monitor\/case-study\/east-coast-railway-link-ecrl\/\" data-toggle=\"tooltip\" data-html=\"true\" data-placement=\"top\" data-original-title=\"[ECRL]&lt;br&gt;&lt;br&gt;Engineering, Procurement, Construction, Commissioning (EPCC)\">OOOOOO<\/a><\/td>\n<td class=\"td-score-2\"><a href=\"http:\/\/103.18.247.248\/~sample\/bri_monitor\/case-study\/gemas-johor-bahru-electrified-double-track-project\/\" data-toggle=\"tooltip\" data-html=\"true\" data-placement=\"top\" data-original-title=\"[G-JB]&lt;br&gt;&lt;br&gt;Engineering, Procurement and Construction (EPC)\">OOOOOO<\/a><\/td>\n<td class=\"td-score-2\"><a href=\"http:\/\/103.18.247.248\/~sample\/bri_monitor\/case-study\/the-tatay-river-hydropower-dam\/\" data-toggle=\"tooltip\" data-html=\"true\" data-placement=\"top\" data-original-title=\"[TRHD]&lt;br&gt;&lt;br&gt;Feasibility Study:&lt;br&gt; Machinery Industry Survey Design and Research Institute&lt;br&gt; (owned by sinomach, the parent company of project owner China National Heavy Machinery Corporation)&lt;br&gt; Northwest Survey Design and Research Institute&lt;br&gt; (Owned by Hydro China, a majority shareholder of Beijing Sanlian International Investment Co., Ltd., a major shareholder of China National Heavy Machinery Corporation\u2019s subsidiary Cambodian Tatay Hydropower Limited)&lt;br&gt;&lt;br&gt; Environmental Impact Assessment:&lt;br&gt; Key Consultants Cambodia&lt;br&gt;&lt;br&gt; Construction:&lt;br&gt; China Gezhouba Group, Ltd.&lt;br&gt;&lt;br&gt; Consultants: &lt;br&gt; P\u00f6yry (Monitored Safety, Design and Quality Control)&lt;br&gt;&lt;br&gt; Machinery and Turbines:&lt;br&gt; Zhejiang Fuchunjiang Hydropower Equipments Co., Ltd &lt;br&gt;&lt;br&gt; Construction Camp Logistics\/Management:&lt;br&gt; GuangDong XinHaiJun Development Company\">OOOOOO<\/a><\/td>\n<td class=\"td-score-4\"><a href=\"http:\/\/103.18.247.248\/~sample\/bri_monitor\/case-study\/letpadaung-copper-mine-project\/\" data-toggle=\"tooltip\" data-html=\"true\" data-placement=\"top\" data-original-title=\"[LCMP]&lt;br&gt;&lt;br&gt;Design &amp; Build, Construction\">OOOOOO<\/a><\/td>\n<td class=\"td-score-2\"><a href=\"http:\/\/103.18.247.248\/~sample\/bri_monitor\/case-study\/the-new-centennial-water-source-kaliwa-dam-project-ncws-kdp\/\" data-toggle=\"tooltip\" data-html=\"true\" data-placement=\"top\" data-original-title=\"[NCWS]&lt;br&gt;&lt;br&gt;Detailed Engineering and Design and Construction\">OOOOOO<\/a><\/td>\n<td class=\"td-score-0\"><a href=\"http:\/\/103.18.247.248\/~sample\/bri_monitor\/case-study\/chico-river-pump-irrigation-project-crpip\/\" data-toggle=\"tooltip\" data-html=\"true\" data-placement=\"top\" data-original-title=\"[CRPIP]&lt;br&gt;&lt;br&gt;Not available\">OOOOOO<\/a><\/td>\n<td><\/td>\n<td class=\"td-score-4\"><a href=\"http:\/\/103.18.247.248\/~sample\/bri_monitor\/case-study\/kumul-submarine-cable-network-project-kscnp\/\" data-toggle=\"tooltip\" data-html=\"true\" data-placement=\"top\" data-original-title=\"[KSCNP]&lt;br&gt;&lt;br&gt; - Shipping transportation, French Vessel Ile De Re.&lt;br&gt; - Cable construction\/laying, Optic Marine Services&lt;br&gt; - Management contract, Huawei Marine\">OOOOOO<\/a><\/td>\n<\/tr>\n<tr>\n<td><span data-toggle=\"tooltip\" data-placement=\"top\" data-original-title=\"Select from pre-award, active or closed\">Contract Status (Current)<\/span><\/td>\n<td class=\"td-score-3\"><a href=\"http:\/\/103.18.247.248\/~sample\/bri_monitor\/case-study\/east-coast-railway-link-ecrl\/\" data-toggle=\"tooltip\" data-html=\"true\" data-placement=\"top\" data-original-title=\"[ECRL]&lt;br&gt;&lt;br&gt;Active\">OOOOOO<\/a><\/td>\n<td class=\"td-score-2\"><a href=\"http:\/\/103.18.247.248\/~sample\/bri_monitor\/case-study\/gemas-johor-bahru-electrified-double-track-project\/\" data-toggle=\"tooltip\" data-html=\"true\" data-placement=\"top\" data-original-title=\"[G-JB]&lt;br&gt;&lt;br&gt;Active \">OOOOOO<\/a><\/td>\n<td class=\"td-score-2\"><a href=\"http:\/\/103.18.247.248\/~sample\/bri_monitor\/case-study\/the-tatay-river-hydropower-dam\/\" data-toggle=\"tooltip\" data-html=\"true\" data-placement=\"top\" data-original-title=\"[TRHD]&lt;br&gt;&lt;br&gt;Closed\">OOOOOO<\/a><\/td>\n<td class=\"td-score-4\"><a href=\"http:\/\/103.18.247.248\/~sample\/bri_monitor\/case-study\/letpadaung-copper-mine-project\/\" data-toggle=\"tooltip\" data-html=\"true\" data-placement=\"top\" data-original-title=\"[LCMP]&lt;br&gt;&lt;br&gt;active\">OOOOOO<\/a><\/td>\n<td class=\"td-score-0\"><a href=\"http:\/\/103.18.247.248\/~sample\/bri_monitor\/case-study\/the-new-centennial-water-source-kaliwa-dam-project-ncws-kdp\/\" data-toggle=\"tooltip\" data-html=\"true\" data-placement=\"top\" data-original-title=\"[NCWS]&lt;br&gt;&lt;br&gt;Not available\">OOOOOO<\/a><\/td>\n<td class=\"td-score-0\"><a href=\"http:\/\/103.18.247.248\/~sample\/bri_monitor\/case-study\/chico-river-pump-irrigation-project-crpip\/\" data-toggle=\"tooltip\" data-html=\"true\" data-placement=\"top\" data-original-title=\"[CRPIP]&lt;br&gt;&lt;br&gt;Not available\">OOOOOO<\/a><\/td>\n<td><\/td>\n<td class=\"td-score-4\"><a href=\"http:\/\/103.18.247.248\/~sample\/bri_monitor\/case-study\/kumul-submarine-cable-network-project-kscnp\/\" data-toggle=\"tooltip\" data-html=\"true\" data-placement=\"top\" data-original-title=\"[KSCNP]&lt;br&gt;&lt;br&gt;Closed\">OOOOOO<\/a><\/td>\n<\/tr>\n<tr>\n<td><span data-toggle=\"tooltip\" data-placement=\"top\" data-original-title=\"Number of firms who submit a tender\">Number of Firms Tendering<\/span><\/td>\n<td class=\"td-score-0\"><a href=\"http:\/\/103.18.247.248\/~sample\/bri_monitor\/case-study\/east-coast-railway-link-ecrl\/\" data-toggle=\"tooltip\" data-html=\"true\" data-placement=\"top\" data-original-title=\"[ECRL]&lt;br&gt;&lt;br&gt;Not available\">OOOOOO<\/a><\/td>\n<td class=\"td-score-0\"><a href=\"http:\/\/103.18.247.248\/~sample\/bri_monitor\/case-study\/gemas-johor-bahru-electrified-double-track-project\/\" data-toggle=\"tooltip\" data-html=\"true\" data-placement=\"top\" data-original-title=\"[G-JB]&lt;br&gt;&lt;br&gt;Not available\">OOOOOO<\/a><\/td>\n<td class=\"td-score-0\"><a href=\"http:\/\/103.18.247.248\/~sample\/bri_monitor\/case-study\/the-tatay-river-hydropower-dam\/\" data-toggle=\"tooltip\" data-html=\"true\" data-placement=\"top\" data-original-title=\"[TRHD]&lt;br&gt;&lt;br&gt;Not available\">OOOOOO<\/a><\/td>\n<td class=\"td-score-2\"><a href=\"http:\/\/103.18.247.248\/~sample\/bri_monitor\/case-study\/letpadaung-copper-mine-project\/\" data-toggle=\"tooltip\" data-html=\"true\" data-placement=\"top\" data-original-title=\"[LCMP]&lt;br&gt;&lt;br&gt;One\">OOOOOO<\/a><\/td>\n<td class=\"td-score-2\"><a href=\"http:\/\/103.18.247.248\/~sample\/bri_monitor\/case-study\/the-new-centennial-water-source-kaliwa-dam-project-ncws-kdp\/\" data-toggle=\"tooltip\" data-html=\"true\" data-placement=\"top\" data-original-title=\"[NCWS]&lt;br&gt;&lt;br&gt;3 (China Energy Engineering Corporation, Power Construction Corporation of China Limited and Consortium of Guangdong Foreign Construction)\">OOOOOO<\/a><\/td>\n<td class=\"td-score-0\"><a href=\"http:\/\/103.18.247.248\/~sample\/bri_monitor\/case-study\/chico-river-pump-irrigation-project-crpip\/\" data-toggle=\"tooltip\" data-html=\"true\" data-placement=\"top\" data-original-title=\"[CRPIP]&lt;br&gt;&lt;br&gt;Not available\">OOOOOO<\/a><\/td>\n<td><\/td>\n<td class=\"td-score-0\"><a href=\"http:\/\/103.18.247.248\/~sample\/bri_monitor\/case-study\/kumul-submarine-cable-network-project-kscnp\/\" data-toggle=\"tooltip\" data-html=\"true\" data-placement=\"top\" data-original-title=\"[KSCNP]&lt;br&gt;&lt;br&gt;Not available\">OOOOOO<\/a><\/td>\n<\/tr>\n<tr>\n<td><span data-toggle=\"tooltip\" data-placement=\"top\" data-original-title=\"Currency and amount of the original pre-tender estimate of the contract\">Cost Estimate<\/span><\/td>\n<td class=\"td-score-0\"><a href=\"http:\/\/103.18.247.248\/~sample\/bri_monitor\/case-study\/east-coast-railway-link-ecrl\/\" data-toggle=\"tooltip\" data-html=\"true\" data-placement=\"top\" data-original-title=\"[ECRL]&lt;br&gt;&lt;br&gt;Not available\">OOOOOO<\/a><\/td>\n<td class=\"td-score-0\"><a href=\"http:\/\/103.18.247.248\/~sample\/bri_monitor\/case-study\/gemas-johor-bahru-electrified-double-track-project\/\" data-toggle=\"tooltip\" data-html=\"true\" data-placement=\"top\" data-original-title=\"[G-JB]&lt;br&gt;&lt;br&gt;2100.00 US$ million (No conclusive evidence has been found in regard to this topic) \">OOOOOO<\/a><\/td>\n<td class=\"td-score-0\"><a href=\"http:\/\/103.18.247.248\/~sample\/bri_monitor\/case-study\/the-tatay-river-hydropower-dam\/\" data-toggle=\"tooltip\" data-html=\"true\" data-placement=\"top\" data-original-title=\"[TRHD]&lt;br&gt;&lt;br&gt;Not available\">OOOOOO<\/a><\/td>\n<td class=\"td-score-2\"><a href=\"http:\/\/103.18.247.248\/~sample\/bri_monitor\/case-study\/letpadaung-copper-mine-project\/\" data-toggle=\"tooltip\" data-html=\"true\" data-placement=\"top\" data-original-title=\"[LCMP]&lt;br&gt;&lt;br&gt;USD - 1 billion\">OOOOOO<\/a><\/td>\n<td class=\"td-score-0\"><a href=\"http:\/\/103.18.247.248\/~sample\/bri_monitor\/case-study\/the-new-centennial-water-source-kaliwa-dam-project-ncws-kdp\/\" data-toggle=\"tooltip\" data-html=\"true\" data-placement=\"top\" data-original-title=\"[NCWS]&lt;br&gt;&lt;br&gt;Not available\">OOOOOO<\/a><\/td>\n<td class=\"td-score-0\"><a href=\"http:\/\/103.18.247.248\/~sample\/bri_monitor\/case-study\/chico-river-pump-irrigation-project-crpip\/\" data-toggle=\"tooltip\" data-html=\"true\" data-placement=\"top\" data-original-title=\"[CRPIP]&lt;br&gt;&lt;br&gt;Not available\">OOOOOO<\/a><\/td>\n<td><\/td>\n<td class=\"td-score-0\"><a href=\"http:\/\/103.18.247.248\/~sample\/bri_monitor\/case-study\/kumul-submarine-cable-network-project-kscnp\/\" data-toggle=\"tooltip\" data-html=\"true\" data-placement=\"top\" data-original-title=\"[KSCNP]&lt;br&gt;&lt;br&gt;Not available\">OOOOOO<\/a><\/td>\n<\/tr>\n<tr>\n<td><span data-toggle=\"tooltip\" data-placement=\"top\" data-original-title=\"Enter name of the organisation carrying out the contract administrative entity if different from the Procuring Entity\">Contract Administration Entity<\/span><\/td>\n<td class=\"td-score-0\"><a href=\"http:\/\/103.18.247.248\/~sample\/bri_monitor\/case-study\/east-coast-railway-link-ecrl\/\" data-toggle=\"tooltip\" data-html=\"true\" data-placement=\"top\" data-original-title=\"[ECRL]&lt;br&gt;&lt;br&gt;Not available\">OOOOOO<\/a><\/td>\n<td class=\"td-score-0\"><a href=\"http:\/\/103.18.247.248\/~sample\/bri_monitor\/case-study\/gemas-johor-bahru-electrified-double-track-project\/\" data-toggle=\"tooltip\" data-html=\"true\" data-placement=\"top\" data-original-title=\"[G-JB]&lt;br&gt;&lt;br&gt;Not available\">OOOOOO<\/a><\/td>\n<td class=\"td-score-0\"><a href=\"http:\/\/103.18.247.248\/~sample\/bri_monitor\/case-study\/the-tatay-river-hydropower-dam\/\" data-toggle=\"tooltip\" data-html=\"true\" data-placement=\"top\" data-original-title=\"[TRHD]&lt;br&gt;&lt;br&gt;Not available\">OOOOOO<\/a><\/td>\n<td class=\"td-score-0\"><a href=\"http:\/\/103.18.247.248\/~sample\/bri_monitor\/case-study\/letpadaung-copper-mine-project\/\" data-toggle=\"tooltip\" data-html=\"true\" data-placement=\"top\" data-original-title=\"[LCMP]&lt;br&gt;&lt;br&gt;Not available\">OOOOOO<\/a><\/td>\n<td class=\"td-score-4\"><\/td>\n<td class=\"td-score-0\"><a href=\"http:\/\/103.18.247.248\/~sample\/bri_monitor\/case-study\/chico-river-pump-irrigation-project-crpip\/\" data-toggle=\"tooltip\" data-html=\"true\" data-placement=\"top\" data-original-title=\"[CRPIP]&lt;br&gt;&lt;br&gt;Not available\">OOOOOO<\/a><\/td>\n<td><\/td>\n<td class=\"td-score-4\"><a href=\"http:\/\/103.18.247.248\/~sample\/bri_monitor\/case-study\/kumul-submarine-cable-network-project-kscnp\/\" data-toggle=\"tooltip\" data-html=\"true\" data-placement=\"top\" data-original-title=\"[KSCNP]&lt;br&gt;&lt;br&gt;PNG DataCo\">OOOOOO<\/a><\/td>\n<\/tr>\n<tr>\n<td><span data-toggle=\"tooltip\" data-placement=\"top\" data-original-title=\"The formal name of the contract\">Contract Title<\/span><\/td>\n<td class=\"td-score-0\"><a href=\"http:\/\/103.18.247.248\/~sample\/bri_monitor\/case-study\/east-coast-railway-link-ecrl\/\" data-toggle=\"tooltip\" data-html=\"true\" data-placement=\"top\" data-original-title=\"[ECRL]&lt;br&gt;&lt;br&gt;Not available\">OOOOOO<\/a><\/td>\n<td class=\"td-score-0\"><a href=\"http:\/\/103.18.247.248\/~sample\/bri_monitor\/case-study\/gemas-johor-bahru-electrified-double-track-project\/\" data-toggle=\"tooltip\" data-html=\"true\" data-placement=\"top\" data-original-title=\"[G-JB]&lt;br&gt;&lt;br&gt;Not available\">OOOOOO<\/a><\/td>\n<td class=\"td-score-0\"><a href=\"http:\/\/103.18.247.248\/~sample\/bri_monitor\/case-study\/the-tatay-river-hydropower-dam\/\" data-toggle=\"tooltip\" data-html=\"true\" data-placement=\"top\" data-original-title=\"[TRHD]&lt;br&gt;&lt;br&gt;Not available\">OOOOOO<\/a><\/td>\n<td class=\"td-score-2\"><a href=\"http:\/\/103.18.247.248\/~sample\/bri_monitor\/case-study\/letpadaung-copper-mine-project\/\" data-toggle=\"tooltip\" data-html=\"true\" data-placement=\"top\" data-original-title=\"[LCMP]&lt;br&gt;&lt;br&gt;The Letpadaung Copper Mine Project\">OOOOOO<\/a><\/td>\n<td class=\"td-score-4\"><a href=\"http:\/\/103.18.247.248\/~sample\/bri_monitor\/case-study\/the-new-centennial-water-source-kaliwa-dam-project-ncws-kdp\/\" data-toggle=\"tooltip\" data-html=\"true\" data-placement=\"top\" data-original-title=\"[NCWS]&lt;br&gt;&lt;br&gt;NCWS-KDP 001-2018\">OOOOOO<\/a><\/td>\n<td class=\"td-score-0\"><a href=\"http:\/\/103.18.247.248\/~sample\/bri_monitor\/case-study\/chico-river-pump-irrigation-project-crpip\/\" data-toggle=\"tooltip\" data-html=\"true\" data-placement=\"top\" data-original-title=\"[CRPIP]&lt;br&gt;&lt;br&gt;Not available\">OOOOOO<\/a><\/td>\n<td><\/td>\n<td class=\"td-score-0\"><a href=\"http:\/\/103.18.247.248\/~sample\/bri_monitor\/case-study\/kumul-submarine-cable-network-project-kscnp\/\" data-toggle=\"tooltip\" data-html=\"true\" data-placement=\"top\" data-original-title=\"[KSCNP]&lt;br&gt;&lt;br&gt;Not available\">OOOOOO<\/a><\/td>\n<\/tr>\n<tr>\n<td><span data-toggle=\"tooltip\" data-placement=\"top\" data-original-title=\"Legal name of supplier\">Contract Firm(s)<\/span><\/td>\n<td class=\"td-score-0\"><a href=\"http:\/\/103.18.247.248\/~sample\/bri_monitor\/case-study\/east-coast-railway-link-ecrl\/\" data-toggle=\"tooltip\" data-html=\"true\" data-placement=\"top\" data-original-title=\"[ECRL]&lt;br&gt;&lt;br&gt;Not available\">OOOOOO<\/a><\/td>\n<td class=\"td-score-2\"><a href=\"http:\/\/103.18.247.248\/~sample\/bri_monitor\/case-study\/gemas-johor-bahru-electrified-double-track-project\/\" data-toggle=\"tooltip\" data-html=\"true\" data-placement=\"top\" data-original-title=\"China Communications Construction Co Ltd, China Railway Construction Corporation Ltd, China Railway&lt;br&gt;Engineering Corporation, SIPP Rail Sdn Bhd and YTL Corporation Berhad\">OOOOOO<\/a><\/td>\n<td class=\"td-score-0\"><a href=\"http:\/\/103.18.247.248\/~sample\/bri_monitor\/case-study\/the-tatay-river-hydropower-dam\/\" data-toggle=\"tooltip\" data-html=\"true\" data-placement=\"top\" data-original-title=\"[TRHD]&lt;br&gt;&lt;br&gt;Not available\">OOOOOO<\/a><\/td>\n<td class=\"td-score-0\"><a href=\"http:\/\/103.18.247.248\/~sample\/bri_monitor\/case-study\/letpadaung-copper-mine-project\/\" data-toggle=\"tooltip\" data-html=\"true\" data-placement=\"top\" data-original-title=\"[LCMP]&lt;br&gt;&lt;br&gt;Not available\">OOOOOO<\/a><\/td>\n<td class=\"td-score-4\"><a href=\"http:\/\/103.18.247.248\/~sample\/bri_monitor\/case-study\/the-new-centennial-water-source-kaliwa-dam-project-ncws-kdp\/\" data-toggle=\"tooltip\" data-html=\"true\" data-placement=\"top\" data-original-title=\"[NCWS]&lt;br&gt;&lt;br&gt;China Energy Engineering Corporation Limited (CEEC)\">OOOOOO<\/a><\/td>\n<td class=\"td-score-4\"><a href=\"http:\/\/103.18.247.248\/~sample\/bri_monitor\/case-study\/chico-river-pump-irrigation-project-crpip\/\" data-toggle=\"tooltip\" data-html=\"true\" data-placement=\"top\" data-original-title=\"[CRPIP]&lt;br&gt;&lt;br&gt;China CAMC Engineering Co.\">OOOOOO<\/a><\/td>\n<td><\/td>\n<td class=\"td-score-4\"><a href=\"http:\/\/103.18.247.248\/~sample\/bri_monitor\/case-study\/kumul-submarine-cable-network-project-kscnp\/\" data-toggle=\"tooltip\" data-html=\"true\" data-placement=\"top\" data-original-title=\"[KSCNP]&lt;br&gt;&lt;br&gt;1) Huawei Technologies&lt;br&gt; 2) China National Machinery Import and Export Corporation&lt;br&gt; 3) Optic Marine Services&lt;br&gt; 4) French Vessel Ile De Re\">OOOOOO<\/a><\/td>\n<\/tr>\n<tr>\n<td><span data-toggle=\"tooltip\" data-placement=\"top\" data-original-title=\"Currency and price at contract award\">Contract Price<\/span><\/td>\n<td class=\"td-score-0\"><a href=\"http:\/\/103.18.247.248\/~sample\/bri_monitor\/case-study\/east-coast-railway-link-ecrl\/\" data-toggle=\"tooltip\" data-html=\"true\" data-placement=\"top\" data-original-title=\"[ECRL]&lt;br&gt;&lt;br&gt;Not available\">OOOOOO<\/a><\/td>\n<td class=\"td-score-2\"><a href=\"http:\/\/103.18.247.248\/~sample\/bri_monitor\/case-study\/gemas-johor-bahru-electrified-double-track-project\/\" data-toggle=\"tooltip\" data-html=\"true\" data-placement=\"top\" data-original-title=\"[G-JB]&lt;br&gt;&lt;br&gt;MYR 8 Billion\">OOOOOO<\/a><\/td>\n<td class=\"td-score-0\"><a href=\"http:\/\/103.18.247.248\/~sample\/bri_monitor\/case-study\/the-tatay-river-hydropower-dam\/\" data-toggle=\"tooltip\" data-html=\"true\" data-placement=\"top\" data-original-title=\"[TRHD]&lt;br&gt;&lt;br&gt;Not available\">OOOOOO<\/a><\/td>\n<td class=\"td-score-0\"><a href=\"http:\/\/103.18.247.248\/~sample\/bri_monitor\/case-study\/letpadaung-copper-mine-project\/\" data-toggle=\"tooltip\" data-html=\"true\" data-placement=\"top\" data-original-title=\"[LCMP]&lt;br&gt;&lt;br&gt;Not available\">OOOOOO<\/a><\/td>\n<td class=\"td-score-3\"><a href=\"http:\/\/103.18.247.248\/~sample\/bri_monitor\/case-study\/the-new-centennial-water-source-kaliwa-dam-project-ncws-kdp\/\" data-toggle=\"tooltip\" data-html=\"true\" data-placement=\"top\" data-original-title=\"[NCWS]&lt;br&gt;&lt;br&gt;Currency unknown (presumably USD) PhP18.2 billion\">OOOOOO<\/a><\/td>\n<td class=\"td-score-3\"><a href=\"http:\/\/103.18.247.248\/~sample\/bri_monitor\/case-study\/chico-river-pump-irrigation-project-crpip\/\" data-toggle=\"tooltip\" data-html=\"true\" data-placement=\"top\" data-original-title=\"[CRPIP]&lt;br&gt;&lt;br&gt;$73.04 million\">OOOOOO<\/a><\/td>\n<td><\/td>\n<td class=\"td-score-0\"><a href=\"http:\/\/103.18.247.248\/~sample\/bri_monitor\/case-study\/kumul-submarine-cable-network-project-kscnp\/\" data-toggle=\"tooltip\" data-html=\"true\" data-placement=\"top\" data-original-title=\"[KSCNP]&lt;br&gt;&lt;br&gt;Not available\">OOOOOO<\/a><\/td>\n<\/tr>\n<tr>\n<td><span data-toggle=\"tooltip\" data-placement=\"top\" data-original-title=\"Main outputs from the contract e.g. detailed design, supervision, project management and or type, quantity, unit for construction\">Contract Scope of Work<\/span><\/td>\n<td class=\"td-score-0\"><a href=\"http:\/\/103.18.247.248\/~sample\/bri_monitor\/case-study\/east-coast-railway-link-ecrl\/\" data-toggle=\"tooltip\" data-html=\"true\" data-placement=\"top\" data-original-title=\"[ECRL]&lt;br&gt;&lt;br&gt;Not available\">OOOOOO<\/a><\/td>\n<td class=\"td-score-2\"><a href=\"http:\/\/103.18.247.248\/~sample\/bri_monitor\/case-study\/gemas-johor-bahru-electrified-double-track-project\/\" data-toggle=\"tooltip\" data-html=\"true\" data-placement=\"top\" data-original-title=\"[G-JB]&lt;br&gt;&lt;br&gt;The scope of the project will include the design, construction, material supply, installation, completion, testing, trial operation and maintenance of the GemasJohor Bahru electric double-track railway.\">OOOOOO<\/a><\/td>\n<td class=\"td-score-0\"><a href=\"http:\/\/103.18.247.248\/~sample\/bri_monitor\/case-study\/the-tatay-river-hydropower-dam\/\" data-toggle=\"tooltip\" data-html=\"true\" data-placement=\"top\" data-original-title=\"[TRHD]&lt;br&gt;&lt;br&gt;Not available\">OOOOOO<\/a><\/td>\n<td class=\"td-score-2\"><a href=\"http:\/\/103.18.247.248\/~sample\/bri_monitor\/case-study\/letpadaung-copper-mine-project\/\" data-toggle=\"tooltip\" data-html=\"true\" data-placement=\"top\" data-original-title=\"[LCMP]&lt;br&gt;&lt;br&gt; Royalties, production sharing ratios, Commercial tax, Income tax from the product\">OOOOOO<\/a><\/td>\n<td class=\"td-score-0\"><a href=\"http:\/\/103.18.247.248\/~sample\/bri_monitor\/case-study\/the-new-centennial-water-source-kaliwa-dam-project-ncws-kdp\/\" data-toggle=\"tooltip\" data-html=\"true\" data-placement=\"top\" data-original-title=\"[NCWS]&lt;br&gt;&lt;br&gt;Not available\">OOOOOO<\/a><\/td>\n<td class=\"td-score-0\"><a href=\"http:\/\/103.18.247.248\/~sample\/bri_monitor\/case-study\/chico-river-pump-irrigation-project-crpip\/\" data-toggle=\"tooltip\" data-html=\"true\" data-placement=\"top\" data-original-title=\"[CRPIP]&lt;br&gt;&lt;br&gt;Not available\">OOOOOO<\/a><\/td>\n<td><\/td>\n<td class=\"td-score-4\"><a href=\"http:\/\/103.18.247.248\/~sample\/bri_monitor\/case-study\/kumul-submarine-cable-network-project-kscnp\/\" data-toggle=\"tooltip\" data-html=\"true\" data-placement=\"top\" data-original-title=\"[KSCNP]&lt;br&gt;&lt;br&gt;- Project supervision and management&lt;br&gt; - Supply of submarine optic cable&lt;br&gt; - construction and laying of 5,457 kilometres of optic submarine optic cable in 14 provincial capitals&lt;br&gt; - technical design and procurement of materials.&lt;br&gt; - Transportation and shipping support services for cable laying. E34\">OOOOOO<\/a><\/td>\n<\/tr>\n<tr>\n<td><span data-toggle=\"tooltip\" data-placement=\"top\" data-original-title=\"Enter dates and Number of weeks from contract start date to (anticipated) completion date\">Contract Start Date &amp; Duration<\/span><\/td>\n<td class=\"td-score-0\"><a href=\"http:\/\/103.18.247.248\/~sample\/bri_monitor\/case-study\/east-coast-railway-link-ecrl\/\" data-toggle=\"tooltip\" data-html=\"true\" data-placement=\"top\" data-original-title=\"[ECRL]&lt;br&gt;&lt;br&gt;Not available\">OOOOOO<\/a><\/td>\n<td class=\"td-score-0\"><a href=\"http:\/\/103.18.247.248\/~sample\/bri_monitor\/case-study\/gemas-johor-bahru-electrified-double-track-project\/\" data-toggle=\"tooltip\" data-html=\"true\" data-placement=\"top\" data-original-title=\"[G-JB]&lt;br&gt;&lt;br&gt;Not available\">OOOOOO<\/a><\/td>\n<td class=\"td-score-2\"><a href=\"http:\/\/103.18.247.248\/~sample\/bri_monitor\/case-study\/the-tatay-river-hydropower-dam\/\" data-toggle=\"tooltip\" data-html=\"true\" data-placement=\"top\" data-original-title=\"[TRHD]&lt;br&gt;&lt;br&gt;MoU for feasibility study signed January 2007 \">OOOOOO<\/a><\/td>\n<td class=\"td-score-2\"><a href=\"http:\/\/103.18.247.248\/~sample\/bri_monitor\/case-study\/letpadaung-copper-mine-project\/\" data-toggle=\"tooltip\" data-html=\"true\" data-placement=\"top\" data-original-title=\"[LCMP]&lt;br&gt;&lt;br&gt;4\/3\/2013 to 4\/3\/2038\">OOOOOO<\/a><\/td>\n<td class=\"td-score-0\"><a href=\"http:\/\/103.18.247.248\/~sample\/bri_monitor\/case-study\/the-new-centennial-water-source-kaliwa-dam-project-ncws-kdp\/\" data-toggle=\"tooltip\" data-html=\"true\" data-placement=\"top\" data-original-title=\"[NCWS]&lt;br&gt;&lt;br&gt;Not available\">OOOOOO<\/a><\/td>\n<td class=\"td-score-4\"><a href=\"http:\/\/103.18.247.248\/~sample\/bri_monitor\/case-study\/chico-river-pump-irrigation-project-crpip\/\" data-toggle=\"tooltip\" data-html=\"true\" data-placement=\"top\" data-original-title=\"[CRPIP]&lt;br&gt;&lt;br&gt;March 8, 2018\">OOOOOO<\/a><\/td>\n<td><\/td>\n<td class=\"td-score-4\"><a href=\"http:\/\/103.18.247.248\/~sample\/bri_monitor\/case-study\/kumul-submarine-cable-network-project-kscnp\/\" data-toggle=\"tooltip\" data-html=\"true\" data-placement=\"top\" data-original-title=\"[KSCNP]&lt;br&gt;&lt;br&gt;- 2018, exact date hard to figure out but anticipated completion end 2019&lt;br&gt; - Project completed June 2020 reasons could relate to inadequate\/timely release of counterparts.\">OOOOOO<\/a><\/td>\n<\/tr>\n<tr>\n<td><span data-toggle=\"tooltip\" data-placement=\"top\" data-original-title=\"Difference between the price at contract award and the current projected price\">Variation to Contract Price<\/span><\/td>\n<td class=\"td-score-3\"><a href=\"http:\/\/103.18.247.248\/~sample\/bri_monitor\/case-study\/east-coast-railway-link-ecrl\/\" data-toggle=\"tooltip\" data-html=\"true\" data-placement=\"top\" data-original-title=\"[ECRL]&lt;br&gt;&lt;br&gt;Difference: RM21.5 billion&lt;br&gt;Original EPCC contract: RM65.5 billion&lt;br&gt;SA (12\/4\/2019): RM44 billion\">OOOOOO<\/a><\/td>\n<td class=\"td-score-0\"><a href=\"http:\/\/103.18.247.248\/~sample\/bri_monitor\/case-study\/gemas-johor-bahru-electrified-double-track-project\/\" data-toggle=\"tooltip\" data-html=\"true\" data-placement=\"top\" data-original-title=\"[G-JB]&lt;br&gt;&lt;br&gt;Not available\">OOOOOO<\/a><\/td>\n<td class=\"td-score-0\"><a href=\"http:\/\/103.18.247.248\/~sample\/bri_monitor\/case-study\/the-tatay-river-hydropower-dam\/\" data-toggle=\"tooltip\" data-html=\"true\" data-placement=\"top\" data-original-title=\"[TRHD]&lt;br&gt;&lt;br&gt;Not available\">OOOOOO<\/a><\/td>\n<td class=\"td-score-0\"><a href=\"http:\/\/103.18.247.248\/~sample\/bri_monitor\/case-study\/letpadaung-copper-mine-project\/\" data-toggle=\"tooltip\" data-html=\"true\" data-placement=\"top\" data-original-title=\"[LCMP]&lt;br&gt;&lt;br&gt;Not available\">OOOOOO<\/a><\/td>\n<td class=\"td-score-0\"><a href=\"http:\/\/103.18.247.248\/~sample\/bri_monitor\/case-study\/the-new-centennial-water-source-kaliwa-dam-project-ncws-kdp\/\" data-toggle=\"tooltip\" data-html=\"true\" data-placement=\"top\" data-original-title=\"[NCWS]&lt;br&gt;&lt;br&gt;Not available\">OOOOOO<\/a><\/td>\n<td class=\"td-score-0\"><a href=\"http:\/\/103.18.247.248\/~sample\/bri_monitor\/case-study\/chico-river-pump-irrigation-project-crpip\/\" data-toggle=\"tooltip\" data-html=\"true\" data-placement=\"top\" data-original-title=\"[CRPIP]&lt;br&gt;&lt;br&gt;Not available\">OOOOOO<\/a><\/td>\n<td><\/td>\n<td class=\"td-score-0\"><a href=\"http:\/\/103.18.247.248\/~sample\/bri_monitor\/case-study\/kumul-submarine-cable-network-project-kscnp\/\" data-toggle=\"tooltip\" data-html=\"true\" data-placement=\"top\" data-original-title=\"[KSCNP]&lt;br&gt;&lt;br&gt;Not available\">OOOOOO<\/a><\/td>\n<\/tr>\n<tr>\n<td><span data-toggle=\"tooltip\" data-placement=\"top\" data-original-title=\"Escalation to date of the price of materials, labour, equipment etc. due to fluctuations in inflation, currency etc.\">Escalation of Contract Price<\/span><\/td>\n<td class=\"td-score-0\"><a href=\"http:\/\/103.18.247.248\/~sample\/bri_monitor\/case-study\/east-coast-railway-link-ecrl\/\" data-toggle=\"tooltip\" data-html=\"true\" data-placement=\"top\" data-original-title=\"[ECRL]&lt;br&gt;&lt;br&gt;Not available\">OOOOOO<\/a><\/td>\n<td class=\"td-score-0\"><a href=\"http:\/\/103.18.247.248\/~sample\/bri_monitor\/case-study\/gemas-johor-bahru-electrified-double-track-project\/\" data-toggle=\"tooltip\" data-html=\"true\" data-placement=\"top\" data-original-title=\"[G-JB]&lt;br&gt;&lt;br&gt;Not available\">OOOOOO<\/a><\/td>\n<td class=\"td-score-0\"><a href=\"http:\/\/103.18.247.248\/~sample\/bri_monitor\/case-study\/the-tatay-river-hydropower-dam\/\" data-toggle=\"tooltip\" data-html=\"true\" data-placement=\"top\" data-original-title=\"[TRHD]&lt;br&gt;&lt;br&gt;Not available\">OOOOOO<\/a><\/td>\n<td class=\"td-score-0\"><a href=\"http:\/\/103.18.247.248\/~sample\/bri_monitor\/case-study\/letpadaung-copper-mine-project\/\" data-toggle=\"tooltip\" data-html=\"true\" data-placement=\"top\" data-original-title=\"[LCMP]&lt;br&gt;&lt;br&gt;Not available\">OOOOOO<\/a><\/td>\n<td class=\"td-score-0\"><a href=\"http:\/\/103.18.247.248\/~sample\/bri_monitor\/case-study\/the-new-centennial-water-source-kaliwa-dam-project-ncws-kdp\/\" data-toggle=\"tooltip\" data-html=\"true\" data-placement=\"top\" data-original-title=\"[NCWS]&lt;br&gt;&lt;br&gt;Not available\">OOOOOO<\/a><\/td>\n<td class=\"td-score-0\"><a href=\"http:\/\/103.18.247.248\/~sample\/bri_monitor\/case-study\/chico-river-pump-irrigation-project-crpip\/\" data-toggle=\"tooltip\" data-html=\"true\" data-placement=\"top\" data-original-title=\"[CRPIP]&lt;br&gt;&lt;br&gt;Not available\">OOOOOO<\/a><\/td>\n<td><\/td>\n<td class=\"td-score-0\"><a href=\"http:\/\/103.18.247.248\/~sample\/bri_monitor\/case-study\/kumul-submarine-cable-network-project-kscnp\/\" data-toggle=\"tooltip\" data-html=\"true\" data-placement=\"top\" data-original-title=\"[KSCNP]&lt;br&gt;&lt;br&gt;Not available\">OOOOOO<\/a><\/td>\n<\/tr>\n<tr>\n<td><span data-toggle=\"tooltip\" data-placement=\"top\" data-original-title=\"Difference between original duration at contract award and the current projected duration in weeks.\">Variation to Contract Duration<\/span><\/td>\n<td class=\"td-score-3\"><a href=\"http:\/\/103.18.247.248\/~sample\/bri_monitor\/case-study\/east-coast-railway-link-ecrl\/\" data-toggle=\"tooltip\" data-html=\"true\" data-placement=\"top\" data-original-title=\"[ECRL]&lt;br&gt;&lt;br&gt;Exact start date of contract unknown, but construction completion extended by 30 months&lt;br&gt;Original completion date: 30\/6\/2024&lt;br&gt;New completion date (SA 12\/4\/2019): 31\/12\/2026\">OOOOOO<\/a><\/td>\n<td class=\"td-score-2\"><a href=\"http:\/\/103.18.247.248\/~sample\/bri_monitor\/case-study\/gemas-johor-bahru-electrified-double-track-project\/\" data-toggle=\"tooltip\" data-html=\"true\" data-placement=\"top\" data-original-title=\"[G-JB]&lt;br&gt;&lt;br&gt;Contract states project should be finished by 2020, however due to the Corona virus outbreak, the date got postponed towards October 2022, with train services starting to run.\">OOOOOO<\/a><\/td>\n<td class=\"td-score-0\"><a href=\"http:\/\/103.18.247.248\/~sample\/bri_monitor\/case-study\/the-tatay-river-hydropower-dam\/\" data-toggle=\"tooltip\" data-html=\"true\" data-placement=\"top\" data-original-title=\"[TRHD]&lt;br&gt;&lt;br&gt;Not available\">OOOOOO<\/a><\/td>\n<td class=\"td-score-2\"><a href=\"http:\/\/103.18.247.248\/~sample\/bri_monitor\/case-study\/letpadaung-copper-mine-project\/\" data-toggle=\"tooltip\" data-html=\"true\" data-placement=\"top\" data-original-title=\"[LCMP]&lt;br&gt;&lt;br&gt;Initial project period was given 3 years \">OOOOOO<\/a><\/td>\n<td class=\"td-score-0\"><a href=\"http:\/\/103.18.247.248\/~sample\/bri_monitor\/case-study\/the-new-centennial-water-source-kaliwa-dam-project-ncws-kdp\/\" data-toggle=\"tooltip\" data-html=\"true\" data-placement=\"top\" data-original-title=\"[NCWS]&lt;br&gt;&lt;br&gt;Not available\">OOOOOO<\/a><\/td>\n<td class=\"td-score-0\"><a href=\"http:\/\/103.18.247.248\/~sample\/bri_monitor\/case-study\/chico-river-pump-irrigation-project-crpip\/\" data-toggle=\"tooltip\" data-html=\"true\" data-placement=\"top\" data-original-title=\"[CRPIP]&lt;br&gt;&lt;br&gt;Not available\">OOOOOO<\/a><\/td>\n<td><\/td>\n<td class=\"td-score-0\"><a href=\"http:\/\/103.18.247.248\/~sample\/bri_monitor\/case-study\/kumul-submarine-cable-network-project-kscnp\/\" data-toggle=\"tooltip\" data-html=\"true\" data-placement=\"top\" data-original-title=\"[KSCNP]&lt;br&gt;&lt;br&gt;Not available\">OOOOOO<\/a><\/td>\n<\/tr>\n<tr>\n<td><span data-toggle=\"tooltip\" data-placement=\"top\" data-original-title=\"Any changes between original scope at contract award and the current scope\">Variation to Contract Scope<\/span><\/td>\n<td class=\"td-score-4\"><a href=\"http:\/\/103.18.247.248\/~sample\/bri_monitor\/case-study\/east-coast-railway-link-ecrl\/\" data-toggle=\"tooltip\" data-html=\"true\" data-placement=\"top\" data-original-title=\"[ECRL]&lt;br&gt;&lt;br&gt;Changes:&lt;br&gt;- The ECRL rail project was originally planned to be developed in two phases, with phase one covering 600km of track and phase two with an 88km stretch. It will now be built in a single phase, with the whole alignment expected to be completed December 2026.&lt;br&gt;- Some modifications have been made to the alignment due to cultural, heritage, and environmental concerns. The realigned stretch will run from Mentakab to Port Klang via Negeri Sembilan to avoid traverse through the Klang Gate Quartz Ridge. The new alignment through N. Sembilan was also due to the lower cost of land acquisition.&lt;br&gt;- The new alignment also resulted in a significant reduction in construction costs from MYR65.5bn ($15.8bn) to MYR44bn ($10bn), based on a comprehensive value engineering exercise.\">OOOOOO<\/a><\/td>\n<td class=\"td-score-0\"><a href=\"http:\/\/103.18.247.248\/~sample\/bri_monitor\/case-study\/gemas-johor-bahru-electrified-double-track-project\/\" data-toggle=\"tooltip\" data-html=\"true\" data-placement=\"top\" data-original-title=\"[G-JB]&lt;br&gt;&lt;br&gt;Not available\">OOOOOO<\/a><\/td>\n<td class=\"td-score-0\"><a href=\"http:\/\/103.18.247.248\/~sample\/bri_monitor\/case-study\/the-tatay-river-hydropower-dam\/\" data-toggle=\"tooltip\" data-html=\"true\" data-placement=\"top\" data-original-title=\"[TRHD]&lt;br&gt;&lt;br&gt;Not available\">OOOOOO<\/a><\/td>\n<td class=\"td-score-2\"><a href=\"http:\/\/103.18.247.248\/~sample\/bri_monitor\/case-study\/letpadaung-copper-mine-project\/\" data-toggle=\"tooltip\" data-html=\"true\" data-placement=\"top\" data-original-title=\"[LCMP]&lt;br&gt;&lt;br&gt;Ivanhoe did feasibility study &amp; EIA\/SIA in 1994\/1996 and MWMCL bought the share. After protests by local villagers, investigation report recommended MWMCL to do ESIA. At present, MWMCL claims that they practice all the measures recommended in ESIA report and uses USD 2 million per year for CSR activities.\">OOOOOO<\/a><\/td>\n<td class=\"td-score-0\"><a href=\"http:\/\/103.18.247.248\/~sample\/bri_monitor\/case-study\/the-new-centennial-water-source-kaliwa-dam-project-ncws-kdp\/\" data-toggle=\"tooltip\" data-html=\"true\" data-placement=\"top\" data-original-title=\"[NCWS]&lt;br&gt;&lt;br&gt;Not available\">OOOOOO<\/a><\/td>\n<td class=\"td-score-0\"><a href=\"http:\/\/103.18.247.248\/~sample\/bri_monitor\/case-study\/chico-river-pump-irrigation-project-crpip\/\" data-toggle=\"tooltip\" data-html=\"true\" data-placement=\"top\" data-original-title=\"[CRPIP]&lt;br&gt;&lt;br&gt;Not available\">OOOOOO<\/a><\/td>\n<td><\/td>\n<td class=\"td-score-0\"><a href=\"http:\/\/103.18.247.248\/~sample\/bri_monitor\/case-study\/kumul-submarine-cable-network-project-kscnp\/\" data-toggle=\"tooltip\" data-html=\"true\" data-placement=\"top\" data-original-title=\"[KSCNP]&lt;br&gt;&lt;br&gt;Not available\">OOOOOO<\/a><\/td>\n<\/tr>\n<tr>\n<td><span data-toggle=\"tooltip\" data-placement=\"top\" data-original-title=\"Summary of reasons for primary changes (e.g. variations) that then lead to changes in contract price, major price fluctuations and accumulative increase or decrease in price.\">Reasons for Price Changes<\/span><\/td>\n<td class=\"td-score-3\"><a href=\"http:\/\/103.18.247.248\/~sample\/bri_monitor\/case-study\/east-coast-railway-link-ecrl\/\" data-toggle=\"tooltip\" data-html=\"true\" data-placement=\"top\" data-original-title=\"[ECRL]&lt;br&gt;&lt;br&gt;The improved ECRL is in line with PH Government\u2019s manifesto to review and revisit all mega projects signed by the previous administration. The conclusion of the negotiations, which began in July 2018, has resulted in substantial savings for the country, which was the ultimate aim of the PH administration when it initiated the negotiation process with China.\">OOOOOO<\/a><\/td>\n<td class=\"td-score-2\"><a href=\"http:\/\/103.18.247.248\/~sample\/bri_monitor\/case-study\/gemas-johor-bahru-electrified-double-track-project\/\" data-toggle=\"tooltip\" data-html=\"true\" data-placement=\"top\" data-original-title=\"[G-JB]&lt;br&gt;&lt;br&gt;Project is expected to cost RM7.3 Billion \">OOOOOO<\/a><\/td>\n<td class=\"td-score-0\"><a href=\"http:\/\/103.18.247.248\/~sample\/bri_monitor\/case-study\/the-tatay-river-hydropower-dam\/\" data-toggle=\"tooltip\" data-html=\"true\" data-placement=\"top\" data-original-title=\"[TRHD]&lt;br&gt;&lt;br&gt;Not available\">OOOOOO<\/a><\/td>\n<td class=\"td-score-0\"><a href=\"http:\/\/103.18.247.248\/~sample\/bri_monitor\/case-study\/letpadaung-copper-mine-project\/\" data-toggle=\"tooltip\" data-html=\"true\" data-placement=\"top\" data-original-title=\"[LCMP]&lt;br&gt;&lt;br&gt;Not available\">OOOOOO<\/a><\/td>\n<td class=\"td-score-0\"><a href=\"http:\/\/103.18.247.248\/~sample\/bri_monitor\/case-study\/the-new-centennial-water-source-kaliwa-dam-project-ncws-kdp\/\" data-toggle=\"tooltip\" data-html=\"true\" data-placement=\"top\" data-original-title=\"[NCWS]&lt;br&gt;&lt;br&gt;Not available\">OOOOOO<\/a><\/td>\n<td class=\"td-score-0\"><a href=\"http:\/\/103.18.247.248\/~sample\/bri_monitor\/case-study\/chico-river-pump-irrigation-project-crpip\/\" data-toggle=\"tooltip\" data-html=\"true\" data-placement=\"top\" data-original-title=\"[CRPIP]&lt;br&gt;&lt;br&gt;Not available\">OOOOOO<\/a><\/td>\n<td><\/td>\n<td class=\"td-score-0\"><a href=\"http:\/\/103.18.247.248\/~sample\/bri_monitor\/case-study\/kumul-submarine-cable-network-project-kscnp\/\" data-toggle=\"tooltip\" data-html=\"true\" data-placement=\"top\" data-original-title=\"[KSCNP]&lt;br&gt;&lt;br&gt;Not available\">OOOOOO<\/a><\/td>\n<\/tr>\n<tr>\n<td><span data-toggle=\"tooltip\" data-placement=\"top\" data-original-title=\"Summary of reasons for primary changes (e.g. variations) that then lead to changes in the scope and duration.\">Reasons for Scope &amp; Duration Changes<\/span><\/td>\n<td class=\"td-score-4\"><a href=\"http:\/\/103.18.247.248\/~sample\/bri_monitor\/case-study\/east-coast-railway-link-ecrl\/\" data-toggle=\"tooltip\" data-html=\"true\" data-placement=\"top\" data-original-title=\"[ECRL]&lt;br&gt;&lt;br&gt;Primary change: total length reduction from 688km to 640km and new rail alignments&lt;br&gt;- New alignment to avoid Klang Gate Quarts Ridge&lt;br&gt;- No more Southern Extension (Gombak North-Serendah-Port Klang) as new alignment also runs to Port Klang through Bangi-Putrajaya-Port Klang&lt;br&gt;- No more North Extension (Kota Bharu-Wakaf Bharu-Pengkalan Kubor) as it does not add substantial value to the transportation network\">OOOOOO<\/a><\/td>\n<td class=\"td-score-2\"><a href=\"http:\/\/103.18.247.248\/~sample\/bri_monitor\/case-study\/gemas-johor-bahru-electrified-double-track-project\/\" data-toggle=\"tooltip\" data-html=\"true\" data-placement=\"top\" data-original-title=\"[G-JB]&lt;br&gt;&lt;br&gt;There were changes in the time duration due to the movement control order that was imposed by the government, thus delaying the project.\">OOOOOO<\/a><\/td>\n<td class=\"td-score-0\"><a href=\"http:\/\/103.18.247.248\/~sample\/bri_monitor\/case-study\/the-tatay-river-hydropower-dam\/\" data-toggle=\"tooltip\" data-html=\"true\" data-placement=\"top\" data-original-title=\"[TRHD]&lt;br&gt;&lt;br&gt;Not available\">OOOOOO<\/a><\/td>\n<td class=\"td-score-0\"><a href=\"http:\/\/103.18.247.248\/~sample\/bri_monitor\/case-study\/letpadaung-copper-mine-project\/\" data-toggle=\"tooltip\" data-html=\"true\" data-placement=\"top\" data-original-title=\"[LCMP]&lt;br&gt;&lt;br&gt;Not available\">OOOOOO<\/a><\/td>\n<td class=\"td-score-0\"><a href=\"http:\/\/103.18.247.248\/~sample\/bri_monitor\/case-study\/the-new-centennial-water-source-kaliwa-dam-project-ncws-kdp\/\" data-toggle=\"tooltip\" data-html=\"true\" data-placement=\"top\" data-original-title=\"[NCWS]&lt;br&gt;&lt;br&gt;Not available\">OOOOOO<\/a><\/td>\n<td class=\"td-score-0\"><a href=\"http:\/\/103.18.247.248\/~sample\/bri_monitor\/case-study\/chico-river-pump-irrigation-project-crpip\/\" data-toggle=\"tooltip\" data-html=\"true\" data-placement=\"top\" data-original-title=\"[CRPIP]&lt;br&gt;&lt;br&gt;Not available\">OOOOOO<\/a><\/td>\n<td><\/td>\n<td class=\"td-score-0\"><a href=\"http:\/\/103.18.247.248\/~sample\/bri_monitor\/case-study\/kumul-submarine-cable-network-project-kscnp\/\" data-toggle=\"tooltip\" data-html=\"true\" data-placement=\"top\" data-original-title=\"[KSCNP]&lt;br&gt;&lt;br&gt;Not available\">OOOOOO<\/a><\/td>\n<\/tr>\n<\/tbody>\n<\/table>\n<\/div>\n<p>[\/vc_column_text][\/vc_column][\/vc_row]<\/p>\n","protected":false},"excerpt":{"rendered":"<p>[vc_row css=&#8221;.vc_custom_1615520298825{margin-top: 0px !important;}&#8221;][vc_column css=&#8221;.vc_custom_1615520189825{margin-bottom: 30px !important;}&#8221;][vc_custom_heading text=&#8221;BRI Regional Transperancy&#8221; font_container=&#8221;tag:h2|font_size:45px|text_align:left|color:%23172f55|line_height:50px&#8221; use_theme_fonts=&#8221;yes&#8221; el_class=&#8221;bri-heading&#8221;][\/vc_column][\/vc_row][vc_row][vc_column][vc_column_text] Not Transparent Transparent Case Study (Country) Malaysia Cambodia Myanmar Philippines Papua New Guinea ECRL G-JB TRHD LCMP NCWS CRPIP DITO KSCNP Project Owner OOOOOO OOOOOO OOOOOO OOOOOO OOOOOO OOOOOO OOOOOO Sector, Subsector OOOOOO OOOOOO OOOOOO OOOOOO OOOOOO OOOOOO OOOOOO Project Name OOOOOO [&hellip;]<\/p>\n","protected":false},"author":1,"featured_media":0,"parent":0,"menu_order":7,"comment_status":"closed","ping_status":"closed","template":"","meta":{"footnotes":""},"class_list":["post-11364","page","type-page","status-publish","hentry"],"_links":{"self":[{"href":"http:\/\/103.18.247.248\/~sample\/bri_monitor\/wp-json\/wp\/v2\/pages\/11364","targetHints":{"allow":["GET"]}}],"collection":[{"href":"http:\/\/103.18.247.248\/~sample\/bri_monitor\/wp-json\/wp\/v2\/pages"}],"about":[{"href":"http:\/\/103.18.247.248\/~sample\/bri_monitor\/wp-json\/wp\/v2\/types\/page"}],"author":[{"embeddable":true,"href":"http:\/\/103.18.247.248\/~sample\/bri_monitor\/wp-json\/wp\/v2\/users\/1"}],"replies":[{"embeddable":true,"href":"http:\/\/103.18.247.248\/~sample\/bri_monitor\/wp-json\/wp\/v2\/comments?post=11364"}],"version-history":[{"count":102,"href":"http:\/\/103.18.247.248\/~sample\/bri_monitor\/wp-json\/wp\/v2\/pages\/11364\/revisions"}],"predecessor-version":[{"id":12188,"href":"http:\/\/103.18.247.248\/~sample\/bri_monitor\/wp-json\/wp\/v2\/pages\/11364\/revisions\/12188"}],"wp:attachment":[{"href":"http:\/\/103.18.247.248\/~sample\/bri_monitor\/wp-json\/wp\/v2\/media?parent=11364"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}